1. Offset lift hook
The Chain Link, part no. 106-2601, mounting bracket,
part no. 105-5738 and (2) capscrews, part no. 323-6 may
also be used on the Greensmaster 3250-D traction unit.
Install chain link to top of cutting unit with mounting
bracket and (2) capscrews. Torque capscrews to 25-30
ft-lbs. (34-40 N-m). Large end of link to hook on
traction unit suspension (Figure 5).
2
1. Chain link
Figure 4
1
g011932
Figure 5
2. Mounting bracket
3
Using the Cutting Unit Prop
No Parts Required
Procedure
Whenever the cutting unit has to be tipped to expose
the bedknife/reel, prop up the rear of the cutting unit
to make sure the nuts on the back end of the bedbar
adjusting screws are not resting on the work surface
(Figure 6).
1. Prop (not provided)
4
Installing the Counter Weights
No Parts Required
Procedure
The cutting units are shipped with the counter weight
mounted to the left end and the motor mount and drive
coupler mounted to the right end of the cutting unit.
To mount the cutting unit in the right front position,
proceed as follows:
1. Remove the 2 capscrews securing the counter weight
to the left end of the cutting unit. Remove the
counter weight (Figure 7).
5
Figure 6
2. Bedknife adjusting screw
nut (2)