To Connect The Refrigerant Piping To The Outdoor Unit - Daikin ERRA08-12EW1 Installer's Reference Manual

Table of Contents

Advertisement

To open/close the stop valve
To handle the stem cap
To handle the service cap

8.2.8 To connect the refrigerant piping to the outdoor unit

ERRA08~12E + ELVH/X12S18+23E
Daikin Altherma 3 R MT F
4P708474-1 – 2023.05
Silicon sealant, make sure there is no gap.
1 Remove the stop valve cover.
2 Insert a hexagon wrench (liquid side: 4  mm, gas side: 4  mm) into the valve
stem and turn the valve stem:
Counterclockwise to open
Clockwise to close
3 When the stop valve CANNOT be turned any further, stop turning.
4 Install the stop valve cover.
Result: The valve is now open/closed.
The stem cap is sealed where indicated with the arrow. Do NOT damage it.
After handling the stop valve, tighten the stem cap, and check for refrigerant
leaks.
Item
Stem cap, liquid side
Stem cap, gas side
ALWAYS use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
After handling the service port, tighten the service port cap, and check for
refrigerant leaks.
Item
Service port cap
Piping length. Keep field piping as short as possible.
Piping protection. Protect the field piping against physical damage.
1 Open the outdoor unit step 1 and 2
2 Detach the outer side of the rubber grommet.
8
Piping installation
|
Tightening torque (N∙m)
13.5~16.5
22.5~27.5
Tightening torque (N∙m)
11.5~13.9
("7.2.2 To open the outdoor
4
unit" [
 78]).
Installer reference guide
101

Advertisement

Table of Contents
loading

Table of Contents