Anchoring The Dryer - Parker KE-MT Series Operating Manual

Adsorption dryer
Table of Contents

Advertisement

EN | User Manual
Transport by crane
Transport the dryer in an upright position to
its location of installation.
For this purpose, attach a girder with suit-
able fi xtures to ensure that the dryer is lifted at
the centre and that the upper pipe bridge is not
crushed between the vessels (see fi gure).
Transport by forklift
When using a forklift, ensure that the dryer is
always in an upright position.
Secure the dryer to ensure that it cannot tilt
or fall from the forklift.

Anchoring the dryer

The upright stand profi les of the dryer are pro-
vided with four pre-drilled anchorage bores.
Use suitable attachment material to anchor
the dryer to the fl oor (see fi gure).
In the case of vibrating fl oors: place the
dryer on suitable vibration dampers
KE-MT 120-600
Transportation, installation and storage
Eyebolt at vessel
Bores at the foot of the dryer
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ke-mt 120 ke-mt 600

Table of Contents