Riello 3479365 Installation, Use And Maintenance Instructions page 53

Table of Contents

Advertisement

Available languages

Available languages

COMBUSTION CHAMBER PRESSURE - MAXIMUM OUTPUT
MOUNTING THE BURNER ON THE BOILER
For the separation of the blast tube from the burner body, follow these instructions:
- Remove the cover (1), the split pin and the pin (2), the nuts (3) and the screws (4).
- Slide the blast tube from the burner body of approx. 100÷120 mm, release the fork of the combustion head shift-
ing (6) removing the spit pins (5).
- Now it is possible to withdraw the blast tube from the slides (7).
- Mount the blast tube to the boiler interposing the gasket (8).
- Set up the proper nozzle and inset the slides (7) in the burner maintaining the distance of approx. 100÷120 mm.
- Mount the fork (6) and hook it by the split pins (5).
- Close the burner, fasten the screws (4), the nuts (3), the split pin and the pin (2).
Burner opening for service
Follow the above instructions without remove the nuts (3).
By lifting the burner using the hooks it is possible ti fix it to the boiler without separating from the blast tube.
2
1
3
5483
4
7
6
5
100÷120mm
2590
BOILER FRONT PLATE DRILLING -
8
COMBUSTION HEAD
PROJECTION
For the combustion
head projection care-
fully follow the boiler
manufacturer indica-
tions.
A proper protection with refractory mate-
rial on the combustion chamber shall be made, when
boilers with frontal smoke box are used.
3
GB
D2783
kg/h
kW
310
M20
D2779

Advertisement

Table of Contents
loading

Table of Contents