Philips EasySense SNS211 MC User Manual page 28

Table of Contents

Advertisement

Maintenance (continued)
Project Back-up and Access Sharing (continued)
Usercase 2: User 2 downloads a project, edits, and uploads again
User 2 opens the
Project 1 is
downloaded to
app and is
phone of User 2
notified that
project data can
be synced.
Click Sync
Working in one project simultaneously
You cannot work simultaneously in one project. If installers want to work simultaneously in one building, we suggest
the following way of working:
• User 1 creates Project Floor 1 and adds User 2 as contributor. User 1 commissions Project Floor 1
• User 2 creates Project Floor 2 and adds User 1 as contributor. User 2 commissions Project Floor 2
• If needed more projects and users can be added
• All users are continuously updated about the status of all Floors and work on their own Projects only
PLt-20022UM - EasySense MasterConnect User Manual 09/22 page 27 of 43
User Two edits
Project 1 can be
Project 1, e.g.
synced. After
sets CCT to
pressing Sync,
5000K, and
Project 1 will be
saves the project.
uploaded.
User 2 gets a
notification that
project has been
synced
successfully.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Easysense sns210 mcEasysense snh211 mc

Table of Contents