10 | Accessories
10.1 Capacity regulator
ATTENTION If the capacity regulator is installed at the factory, it is subsequently
Fig. 18
Fig. 19
Delivery condition 1 (from the factory):
Cylinder cover prepared for capacity regulator.
Fig. 21
Delivery condition 2 (from the factory):
Connect capacity regulator in terminal box or
switch cabinet.
installed and connected by the customer.
CR 1
HG44e
CR 1
Before commissioning, the blind flange with
screws must be removed and replaced by the
new set capacity regulator with O-ring joints
and screws. Observe position and construction
of the capacity regulator.
Attention! Compressor is under pressure!
Depressurize the compressor first.
CR 2
HG56e
D
GB
F
E
Fig. 20
33