SBI HEATFLOW S5 Installation Instructions Manual page 17

Forced air system
Hide thumbs Also See for HEATFLOW S5:
Table of Contents

Advertisement

10.
Conduit configuration & assembly instructions
WARNING : THE USE OF INSULATED DUCTING IS PROHIBITED
The configuration of the ductwork system will have a direct effect on the capacity of the
blower to distribute the warm air efficiently.
The HEATFLOW S5 must never be connected to the existing ductwork system of a furnace.
To use an existing ductwork system, the furnace must be completely removed. The
HEATFLOW S5 must be the only heating source connected to the ductwork.
Only use rigid galvanised ductwork and HVAC foil tape to seal the ductwork.
The use of an airflow damper or damper blade(s) is highly recommended in each conduit leading to
an air outlet in order to balance the airflow in the system.
The ductwork should always be secured to reduce vibration noise.
The ductwork should always have a positive slope towards each air outlet for good gravity airflow.
The air registers should always be made of metal.
Attach each section of ductwork with at least 3 self drilling screws.
Reducing deviations in the system will result in a better airflow to the air outlets.
Number of air outlet [MIN - MAX]
Recommended diameter of main ductwok
TOTAL length of main ductwork
Recommended length of main ductwork after the blower
Distance between stove and blower [MIN - MAX]
Length of secondary ductwork from main ductwork
TOTAL Length of secondary ductwork
TOTAL length of ductwork system
Recommended speed of air draft at the air outlet (feet per minute)
Installation Instruction HEATFLOW S5
WARNING
DUCTWORK DIMENSIONS
English
[1 – 4]
6 in
50ft (15.2m) MAX
38ft (12.2m) MAX
[6.5ft (1.9m) / 12ft (3.6m)]
12ft (3.6m) MAX
48ft (14m) MAX
100ft (30m) MAX
500 to 750 fpm
2023-05-25
17
46310A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac02110

Table of Contents