Page 1
WARNING: DECORATIVE PANELS MUST BE REMOVED TO USE THIS ACCESSORY. THIS WILL NOT ALTER THE PRODUCT WARRANTY WARNING: The HEATFLOW S5 CANNOT BE ASSEMBLED WITH A HEATSHIELD (AC02762), LOWERED CEILING, INSIDE AN ALCOVE OR IN A MOBILE HOME. WARNING: The HEATFLOW S5 IS NOT A CENTRAL HEATING SYSTEM...
1. General information This forced heat distribution system supports heating adjacent and upper rooms located at a maximum distance of 50’ (15,2m) from the stove. Rooms below the HEATFLOW S5 cannot be heated with the system. 2. Content of the accessory...
Page 6
Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 7
Wear protective gloves for the following instructions WARNING The HEATFLOW S5 can only be assembled with a single wall pipe, refer to the Annex for double wall pipe retrofit. The HEATFLOW S5 cannot be assembled with a Heat shield (AC02762), lowered ceiling, inside an alcove or in a mobile home.
Page 8
2. Place the flue collar (A) with 3 self-drilling screws. (N) 3. Place the back panel (B) with the 10 metal screws (K) on the back of stove. Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 9
4. Cut the self-adhesive gasket (H) into 4 parts and stick them on the 4 bent up frame of the front panel. (C) 5. Place the front panel (C) on the top of stove. Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 10
10 metal screws (K) on the front and back panels. 8. Install the 6’’ adaptor (L) on the top panel. (F) IMPORTANT`: dents in DETAIL B on the top panel must be pointing downward. Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 11
6” adaptor (L) with a hammer so that it is fixed in place. 10. Install the top panel (F) on the other panels with 22 metal screws. (K) Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 12
3 (O) screws previously removed. 12. With the help of pliers, remove the spring pin (CC) blocking rotation of the door handle. 13. With pliers, remove the small spring pin. (DD) Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 13
17. Verify the door seal by closing and locking it on a bit of paper. If the paper slips easily anywhere around the door, door adjustment must reviewed or the seal gasket must changed. Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 14
7. Clearance of the HEATFLOW S5 to combustible material WARNING The HEATFLOW S5 can only be assembled with a single wall pipe, refer to the Annex for double wall pipe retrofit. The HEATFLOW S5 cannot be assembled with a Heat shield (AC02762), lowered ceiling, inside an alcove or in a mobile home.
Clearance around the blower box 1in MIN Clearance around duct connected to blower 1in MIN Clearance around air register 1in MIN Blower duct length to HEATFLOW S5 (min – max) 6.5ft (2m) – 12 ft (3.7m) Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 16
Install the blower with rubber washers included with the blower to lower vabration noises. 18. Connect motor connector (T) to the blower. 19. Install blower adaptor (J) on the blower with self-drilling screws. (N) Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
9. Electrical wiring WARNING The installation of the Heatflow S5 requires a power outlet (120V). The wiring must be done in accordance with the local legislation/norms and with the national building code. The wiring must be done by a certified electrician only.
Page 18
The configuration of the ductwork system will have a direct effect on the capacity of the blower to distribute the air efficiently. The HEATFLOW S5 must never be connected to the existing ductwork system of a furnace. To use an existing ductwork system, the furnace must be completely be removed. The HEATFLOW S5 must be the only heating source connected to the ductwork.
Page 19
If at a last air outlet, it is impossible to keep an airflow consistent with the first air outlets, it might be an indicator that the section of the ductwork should be reduced. 7. The damper of the furthest air outlet from the stove should be open. Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 20
IMPORTANT : If the stove is new, it is normal to have an odor of smoke when lighting it for the first time. This intitial fire should always be done before connecting the air ductwork system to the HEATFLOW S5 in order to prevent the odor of smoke being dispersed to all rooms.
Blower (outtake, airflow) 6’’ (152mm), 400 CFM Power (electrical) 200 watts Fan delay 110°F (43°C) Main duct diameter 6’’ (152mm) Number of air outlets 4 MAX Length of main duct 50’ (15,2 m) MAX Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 22
Annex A. Assembly instruction for retrofit of models with decorative panels WARNING : If the HEATFLOW S5 was disassembled, decorative panels must be put back on the stove. Unscrew the 3 screws (AA) behind the decorative panel (BB). Gently twist decorative panel to remove.
Page 23
Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...
Page 24
G3A 2H3 responsible for problems, injuries,or damages arising out 418-908-8002 of the use of information contained in any document www.sbi-international.com obtained from unauthorized sources. Installation Instruction HEATFLOW S5 English 46310A 2023-03-15...