Unpacking, Scope Of Delivery; Assembly, Levelling - KERN KFD V20 Installation Instructions Manual

Drive-through scale
Table of Contents

Advertisement

7.2 Unpacking, Scope of delivery

+
CAUTION
+
 Remove outer packaging and packaging material.
 Lift the weighing bridge equally off the packaging material, see caution note.
Secure the weighing bridge that it cannot fall down when it is lifted.
 Ensure that the contents of package is complete.
Scope of delivery:
• Weighing bridge see chapter 3
• Operating instructions

7.3 Assembly, levelling

Accurate weighing results require a weighing bridge with perfect horizontal
alignment. During initial installation and after each change of work area it is
necessary to level the weighing bridge.
 Prior to the final placing, install the four weighing cell feet.
 Place the weighing bridge equally on the installation site and check if it is in an
even position and all four feet are in contact with the floor. Level the weighing
bridge by turning the weighing cell feet. For this purpose use an external levelling
appliance, e.g. a water level.
Ensure that the connecting cable is not damaged or squeezed during lifting and
placing.
KFD V20-IA-e-1714
Danger for the back!
The weighing bridge is relatively heavy. Always use a suitable
lifting device to lift it out of the packaging or to transport it to
the required installation site.
Do not step under the suspended load, risk of injury!
The weighing bridge must be aligned with the help of a
+
water level.
All setting feet must rest equally.
+
Verified weighing systems:
In case of verified weighing systems the weighing bridge must be
firmly fixed on the floor. This is essential for the reproducibility of
the measuring results. Optionally using two access ramps or two
pairs of foot plates or a combination of both.
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kfd v40

Table of Contents