Monitoring Of Test Resources; Basic Safety Precautions; Pay Attention To The Instructions In The Operation Manual; Personnel Training - KERN KFD V20 Installation Instructions Manual

Drive-through scale
Table of Contents

Advertisement

4.5 Monitoring of Test Resources

In the framework of quality assurance the measuring-related properties of the
weighing system and, if applicable, the testing weight, must be checked regularly.
The responsible user must define a suitable interval as well as type and scope of this
test. Information is available on KERN's home page
to the monitoring of weighing system test substances and the test weights required
for this. In KERN's accredited DKD calibration laboratory test weights and weighing
systems may be calibrated (return to the national standard) fast and at moderate
cost.

5 Basic Safety Precautions

5.1 Pay attention to the instructions in the Operation Manual

Carefully read this operation manual before setup and commissioning,
even if you are already familiar with KERN balances.

5.2 Personnel training

The appliance may only be operated and maintained by trained personnel.
The installation of a display unit must only be carried out by a well acquainted
specialist with the workings of weighing balances.

6 Transport and storage

6.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the
appliance itself when unpacking for possible visible damage.

6.2 Packaging / return transport

 Keep all parts of the original packaging for a possibly
 Only use original packaging for returning.
 Prior to dispatch disconnect all cables and remove
 Reattach possibly supplied transport securing devices.
 Secure all parts against shifting and damage.
KFD V20-IA-e-1714
required return.
loose/mobile parts.
(www.kern-sohn.com
with regard
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kfd v40

Table of Contents