Installation Procedure - Mitsubishi Electric GT15V-75V4 User Manual

Input unit
Hide thumbs Also See for GT15V-75V4:
Table of Contents

Advertisement

4. Installation Procedure

(1) Power off the GOT.
(2) Remove two extension unit covers of the GOT.
(3) Attach the extend interface relay board to the extend I/F-2 side on the
GOT.
After the installation, detach the connector cover from the extend
interface relay board.
(4) Fit the video/RGB input unit in the GOT case.
4)
(5) Fasten the video/RGB input unit by tightening its mounting screws (4
places) with tightening torgue 0.36 to 0.48 N•m.
(6) Fasten the bus connection unit by tightening the board fixing screws (2
places) with the tightening torque of 0.36 to 0.48 N•m.
5)
Remove the connector cover
3)
6)
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt15v-75v4r1Got1000 seriesGt15v-75r1

Table of Contents