4. PROCEDURE UP TO START OF DATA LINK

4.1 Procedure up to start of data link
The procedure ranging from the installation of the AJ65BTS-RPH
module to the start of data link is described below.
Install the AJ65BTS-RPH module.
Set the switches of the module.
Connect the modules using CC-Link
dedicated cables.
Check for the connection conditions
of the modules (line test).
Start the system.
Completion
POINT
The procedure described here is for the AJ65BTS-RPH module only.
In order for you to understand the procedure of the entire CC-Link
system, refer to the User's Manual of the applicable master module.
Start
Refer to Section 4.2.
Refer to Section 4.3.
Refer to Section 4.4.
Refer to Section 4.5.
Refer to the User's Manual
of the applicable master module.