With machine in work position adjust the top link
to bring machine frame into the vertical position.
Finally, slew the machine into the transport
position, replace slew lock pin (transport
mode) and close lift ram tap.
Attachment is now complete and the
machine ready for transportation to the
work site.
NOTE:
For initial installation refer to running up
procedure.
15