Danfoss iC7 Series Installation Manual page 14

In-back/out-top cooling kit for fa09-fa10, frequency converters
Hide thumbs Also See for iC7 Series:
Table of Contents

Advertisement

In-back/Out-top Cooling Kit for FA09-FA10
Installation Guide
3.
Secure the grill to the duct frame using 1 M5 nut on each stud.
Torque to 2.3 Nm (20 in-lb).
4.
Affix the grill gasket to the outer side of the back grill.
5.
Affix the duct base gasket to the duct base cover.
6.
Secure the base cover to the underside of the duct frame with 12 M5 nuts (for FA09) or 14 M5 nuts (for FA10).
Torque to 2.3 Nm (20 in-lb).
7.
Place the front gasket on the front side of the duct frame, making sure the holes in the frame and gasket align.
8.
Affix the top gasket to the top of the duct frame.
Wait to attach the front duct cover until the lower duct assembly is installed in the cabinet.
1
2
3
4
Illustration 12: Assembly of Lower Duct
1
Top gasket
2
Front gasket
3
M5 nut
4
Front cover
5
Grill gasket
2.10 Installing the Lower Duct
To attach the lower duct to the frequency converter, use the following steps.
Procedure
1.
Place the strip gasket over the 2 slots at the bottom back of the frequency converter.
14 | Danfoss A/S © 2022.03
6
Back grill
7
Side gaskets, left and right
8
Duct frame
9
Base gasket
10
Duct base cover
AN371942666355en-000101 / 136R0250
Installation
5
6
7
8
9
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

176f4042176f4043

Table of Contents