Download Print this page

EIBENSTOCK PLB 450 Original Instructions Manual page 17

Diamond drill rigs

Advertisement

Available languages

Available languages

Make sure to always keep the work area in view and to be able to reach all
necessary operating elements and safety installations.
Keep other persons away from your work area in order to avoid accidents.
Space requirements for operating and maintenance
Whenever possible, keep a free space for operating and maintenance of about 2 m
around the drill position, so that you can work safely and have immediate access in
case of a failure.
Inclined drilling
Drilling
Remove the screw, which locks the column at 90°.
Open the top screw of the support with the turnstile.
Place the column into the desired position and
screw the support at the appropriate hole on back.
The different adjustable tilt angles are marked on the
column.
After drilling put the column back in the 90°position.
Important!
Necessarily secure column at 90 ° with the screw!
16

Advertisement

loading