CENTURION SYSTEMS V400 Mechanical Installation Manual page 4

Linear swing gate operator
Table of Contents

Advertisement

FAST TRACK Mechanical Setup
These quick steps are for the experienced installer who needs a checklist to get a
standard installation up and running in the minimum of time.
Detailed installation features and functions are referred to later in this manual.
STEP
Gather Required Tools and Equipment
1
STEP
Heed Necessary Site Considerations
2
STEP
Check Cabling Requirements
3
STEP
Determine Gate Swing Angle
4
Determine Installation Type
STEP
Inward Opening Installation
5
Outward Opening Installation
STEP
Confirm that gate leaf meets allowable wind loading specifications
6
STEP
Mount the Gate and Wall Bracket(s)
7
STEP
Install Operator and Link to Gate
8
STEP
Mount Controller Enclosure
9
page 4
www.CentSys.com

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the V400 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

V500

Table of Contents