Maintenance; Disposal; Spare-Parts Request - FLOWTECH flowboost F.H Operation And Maintenance Manual

Table of Contents

Advertisement

12

Maintenance

Before any operations it's necessary to disconnect the power supply. If required ask to an electrician or to an
expert technician.
Every maintenance operations, cleaning or reparation executed with the electrical system under voltage, it
could cause serious injuries to people.
If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified
persons in order to avoid a hazard.
In case of extraordinary maintenance, or maintenance operations that require part-removing, the operator
must be a qualified technician able to read schemes and drawings.
It is suggest to register all maintenance operation executed.
During maintenance keep particular attention in order to avoid the introduction of small external parts that
could compromise the device safety.
It is forbidden to execute any operations with the direct use of hands. Use water-resistant, anti-cut gloves to
disassemble and clean the filter or in other particular cases.
During maintenance operations external personnel is not allowed.
Maintenance operations that are not described in this manual must be made only by special personnel
authorized by Flowtech.
For further technical information regarding the use or the maintenance of the device, contact Flowtech.
Routine maintenance
Before every maintenance operations disconnect the power supply and make sure that the device could not
accidentally operate.
In the case of water containing chloride (chlorine, sea water), the risk of corrosion increases in stagnant water
conditions (also with an increase in temperature and decrease of pH value). In these cases, if the pump
remains inactive for long periods, it must be emptied completely and, preferably, dried.
For good measure, as in the case of temporary operation with dirty liquids, run the pump briefly with clean
water to remove deposits. When the pump remains inactive it must be emptied completely if there is a risk of
freezing.
Before restarting the unit, check that the shaft is not jammed and fill the pump casing completely with liquid.
Dismantling the pump
Close the suction and delivery gate valves and drain the pump casing before dismantling the pump. For
dismantling and re-assembly see construction in the cross section drawing. By removing the screws and the
square nuts (2,4,8) the motor can be taken out complete, with all internal parts of the pump, without removing
the pump casing and the pipes.

Disposal

The final disposal of the device must be done by specialised company. Make sure the company follows the
classification of the material parts for the separation.
Observe the local regulations and dispose the device accordingly with the international rules for environment
protection.

Spare-parts request

When ordering spare parts, please quote their designation, position number in the cross section drawing and
rated data from the pump name plate (type, date and serial number).

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the flowboost F.H and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents