A Ppendix : F Ibre Cc Hannel Cc Onneccted S Torage D Evicce; Preliminary Setup Procedures - 8e6 Technologies HL-002-006 Quick Start Manual

Table of Contents

Advertisement

a
: san i
ppendix
a
: f
ppendix
d
eviCe
This appendix pertains to the installation of the optional NAS (Fibre Channel Connected
Storage Device or "SAN") unit.

Preliminary Setup Procedures

Unpack the Unit from the Carton
Inspect the packaging container for evidence of mishandling during transit. If the packag-
ing container is damaged, photograph it for reference.
Carefully unpack the unit from the carton and verify that all accessories are included.
Save all packing materials in the event that the unit needs to be returned to 8e6 Tech-
nologies.
The carton should contain the following items:
1 Nexsan Technologies unit
1 Mounting Kit
1 Accessory Kit containing:
2 AC Power Cords
1 Fibre Channel cable
Other Required Installation Items
In addition to the contents of the Nexsan carton, you will need the following items to
install the storage device:
1 Standard CAT-5E cable
1 CAT-5E crossover cable (from the ER server carton)
Inspect the unit and accessories for damage. If the contents appear damaged, file a
damage claim with the carrier immediately.
NOTE: Refer to the ER safety precautions. In addition to being applicable to
the ER, this information also applies to this storage device unit.
8
8
nstallation
C
iBRe
hannel
C
onneCted
8
8
6 e
6 e
r
r
e
e
nterprise
nterprise
eporter
eporter
s
toRage
Q
Q
s
s
G
G
uick
uick
tart
tart
uide
uide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-002-002Hl-002-002Hl-022-002ErHl-022-006

Table of Contents