Installation; Space Requirements; Installation Process - Mitsubishi Electric E1100 Installation Manual

Operator terminal
Table of Contents

Advertisement

2

Installation

2.1 Space Requirements

– Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
– Space requirements when installing the operator terminal:
252 mm
(9.92 inch)
50 mm
(2.0 inch)
Caution
The openings on the enclosure are for air convection. Do not cover these openings.

2.2 Installation Process

1. Unpack and check the delivery. If damage is found, notify the supplier
Note:
Place the operator terminal on a stable surface during installation.
Dropping it or letting it fall may cause damage.
2. Place the panel cut out where the operator terminal is to be situated, draw along
the outer sides of the holes and cut according to the markings. If access to the
text strips is needed, add extra space in the left corners.
Mitsubishi Electric, MA00778A
100 mm
(4.0 inch)
50 mm
(2.0 inch)
100 mm
(4.0 inch)
382 mm
(15.04 inch)
Panel cut out
x 14
For text strip
3.5 mm
(0.14 inch)
6.5 mm
(0.26 inch)
Installation
100 mm
(4.0 inch)
58 mm
(2.28 inch)
.
343 x 208 mm
(13.5 x 8.18 inch)
2-1

Advertisement

Table of Contents
loading

Table of Contents