Water Connection - Bartscher RK501 LPWR Manual

Table of Contents

Advertisement

Installation Instructions
5.4

Water Connection

Fig. 15
A water flow in the water supply system may not be lower than 20 litres/minute.
With water hardness exceeding 14 °fH (8 °dH), it is recommended to use an
appliance with a built-in water softener. With water hardness exceeding 35 °dH
(19.5 °dH), it is recommended to install an external water softener before the
solenoid valve.
High electric conduction of water indicates a very high concentration of minerals
dissolved in water; in such a case, demineralization device should be installed.
Appliances intended for operation with desalted water or water with high
concentration of sodium chloride should be ordered separately, as special
minerals are required for their construction.
Appliances equipped with a heat recovery installation with copper tubing may
not be operated with de-mineralized water. In such cases, a version with heat
exchanger with stainless steel tubing should be ordered.
Furthermore, when checking the water quality, the pressure of water supply
system must be taken into account. This parameter determines the correct
operation of the appliance.
110645
The appliance is connected with a hose to
a water supply system.
Between the water connection and the
appliance's solenoid valve, a cut-off valve
must be installed. The cut-off valve must
be positioned in the vicinity of the
appliance.
The water supply system, temperature and
pressure must comply with data on the
appliance's rating plate.
EN
15 / 32

Advertisement

Table of Contents
loading

This manual is also suitable for:

110645

Table of Contents