Stanley IK900 Instruction Manual page 10

Pellet insert
Table of Contents

Advertisement

Push the movable part to the wall so that it slides on the rails. Check the correct sliding and that everything is properly
attached before continuing with the installation. Move the equipment to the end of runner system with open safety latches and
once in position, close them to ensure that the equipment is properly placed in the working position.
Connect the power cord to a 230V 50Hz grounded outlet.
After connecting the power cable to the silo column, it is necessary to attach the cable to the same column and the base,
making sure to leave enough cable length, so that the equipment can make the entire route in the rails (500 mm), without the
cable being stressed or touching the hot parts (Figure 11).
Figure 9 – Installation
Figure 10 – Electrical connection
Figure 11 – Electrical connection
9

Advertisement

Table of Contents
loading

Table of Contents