SolarEdge Home Battery 48V Installation Manual page 22

Table of Contents

Advertisement

IAC-RBAT-5KCNCT-01
IAC-RBAT-5KCNCT-02
 3. Release the three screws and slide the left side door, that covers control interfaces
on the left side of the battery module, to allow clear and secure access to the battery
module interfaces.
 4. Before continuing with the installation, make sure the battery is OFF, then make sure
that the front panel LEDs are OFF. If the battery is on, first turn OFF the CB, then the
soft switch, as follows:
Home Battery 48V Installation Guide MAN-01-00954-1.1
10 DC connectors (red) – battery
side
10 DC connectors (black) – battery
side
10 RJ45 connectors – inverter side
10 waterproof RJ45 – connectors
20 DC connectors (red)
20 DC connectors (black)
20 waterproof RJ45 connectors
Figure 12: Access to the left side interfaces
   21