Wiring Diagrams - LG ARVU053ZEA2 Engineering Manual

Energy recovery ventilator
Hide thumbs Also See for ARVU053ZEA2:
Table of Contents

Advertisement

Figure 13:ZE Chassis.
• There is risk of electric shock due to failure or electric leakage.
• Installation work must be performed by authorized personnel and in accordance
with the national wiring standards.
*
*Central controller requires PI485 (PSNFP14A0)
*
Pu rchase a dedicated circuit separately
*
Field Wiring
*
Accessory
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.

WIRING DIAGRAMS

Note
RD
: RED
BR
: BROWN
BL
: BLUE
BK
: BLACK
OR
: ORANGE
YL
: YELLOW
WH
: WHITE
GN/YL : GREEN / YELLOW
ZE Chassis
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents