STEP 1
1. Remove all contents from box
2. Unscrew and remove bottom grease splash shield
STEP 3
1. Locate electrical connection box knock out from left
rear of hood and pry open with screwdriver
STEP 5
1. Reinforce cabinet base with 1x2 wood strips if
additional strengthening is required.
2. Unscrew and remove bottom grease splash shield
INSTALLATION
STEP 2
1. Locate electrical connection box inside
2. Unscrew cover to reveal wiring
STEP 4
1. Cut out cabinet base opening if necessary. Refer
cut out dimensions previous page.
STEP 6 (also refer notes on pg. 16)
1. Install damper if required by local codes (not
provided), or install 6" starting collar (green)**
10
Need help?
Do you have a question about the AK2000 and is the answer not in the manual?
Questions and answers