Commissioning Instructions - Kinetico Premier Plus Installation And User Manual

Table of Contents

Advertisement

Available languages

Available languages

Commissioning instructions

1
Pressurise:
With the water to the property restored, slowly move the assembly to the "in
service" position. Water may run to drain until the unit is fully pressurised.
2
Fill the brine tank
with water:
Allow the brine tank to fill with
water until the brine valve shuts off.
The water level should be
approximately 50mm over the
grid plate.
Water level
Original Version
Grid plate
3
Initiate a backwash:
a:
Using a Phillips head screwdriver
push down on the actuator, and
slowly turn CLOCKWISE until the
indicator dot reaches the letters
BW on the clear cap.
b:
You will hear a rush of water and
air going to the drain.
c:
When the cycle has finished
(approx 4 mins), repeat the
procedure, turn the indicator dot
to the next backwash cycle and
allow to finish (approx 4 mins).
Actuator
15
Indicator
www.kinetico.eu

Advertisement

Table of Contents
loading

This manual is also suitable for:

903102

Table of Contents