Install the OCP 3.0 adapter.
7.
Connect the cables.
8.
Install the access panel.
9.
10. Slide the server into the rack.
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server.
Installing the DSP DSC-25 2p SFP28 card
Procedure
Power down the server.
1.
Do one of the following:
2.
Extend the front drive cages out of the chassis.
•
Remove the server from the rack.
•
Place the server on a flat, level work surface.
3.
Remove the access panel.
4.
Hitachi Advanced Server HA820 G2 User Guide
130