Value-Line
Installation Guide for 701269-WLX-MB, 701269-WSX-MB, 701269-WTX-MB, 701269-RL-MB, 701269-RS-MB
1. Tools required: Measuring tape, wire
strippers (optional: drill, screwdriver).
4. Clean Channel Letter:
Clean inside letter with
rubbing alcohol and allow
to dry.
WARNING Check polarity:
All connections must be RED-TO-RED (+) and BLACK-TO-BLACK (-). Reverse polarity connections may damage LEDs and will void product warranty.
7. Connections: Modules
may be connected in
series or parallel.
2. Supplies Required: PLTC cable, wire
nuts, IDC connectors or butt splices and
cable ties Optional: screws and silicone.
(3M Scotchlok connectors for
European installations only.)
5. Peel and Stick: Using predetermined layout and LED
placement from step 3, remove tape backing and stick
modules into place. Ensure modules are firmly
attached. (CAUTION: when handling module, avoid
pressing down directly on top of LED.)
8. Cap all Unused Wires:
Strand of modules
should not be looped to
create a closed circuit.
3M Scotchlok connectors for
European installations only.
Not UL recognized for North
American installations.
9. Connect Power Supply to First
Module on String: See Power
Supply Install Guide for more
information regarding power
supply installation.
CAN DEPTH
STROKE WIDTH
3. Layout: Noting can depth, stroke width
and face material, use layout guidelines
and power supply capacity charts on page
2 to determine spacing and amount of
LEDs required.
6. Fasteners: If desired,
modules can be secured
with #6 pan head sheet
metal screws or 1/8 in (3 mm)
aluminum rivets.
PAGE 1 OF 2
Need help?
Do you have a question about the Value-Line 701269-WLX-MB and is the answer not in the manual?
Questions and answers