Download Print this page
SloanLED SignBOX II Installation Manual

SloanLED SignBOX II Installation Manual

Advertisement

Quick Links

SignBOX™ II
Installation Guide for 701946-XWD201, 701946-XWS201
Tools required: Measuring tape, wire
strippers, gloves, cutting tool (sheet metal
shears/snips, scissors, utility knife), drill,
and screwdriver.
Installation
1. Cutting product: Cut straps (along dashed
lines) and wires between modules to obtain
required length. Tip: Before cutting wires,
refer to Joining Product section.
Joining Product
2. When cutting wires between modules,
leaving one side longer will aid in joining
product where needed. If, however, wires
are not long enough for connections, use
either jumper wires or remove a module to
maximize wire length.
Supplies required: PLTC cable, #8 (M4)
self-drilling/self-tapping tek screws (required
to pierce through strap), minimum length 5/8
in (4 mm), wire nuts, IDC connectors or butt
splices with appropriate safety agency markings.
Optional: cable ties, silicone, double stick tape.
SignBOX II mounting hardware: Clamps (P/N
410155), Couplers (P/N 401330) (as needed),
SB2-MC
SLO-SB2-C
and Brackets (P/N 401309) (optional).
SLO-SB2-EB
3. Use SignBOX II Clamps (P/N 410155) and
SLO-SB2-MC
SignBOX II Couplers (P/N 401330) to join
SLO-SB2-C
shorter pieces of product to required length.
Insert straps from both sides of modules into
clamps (track features facing same direction)
modules, snap closed (avoid pinching wires),
slide onto couplers, and secure to them with
#8 (M4) tek screws. Connect wires.
800.CALL IEC
(225.5432)
SIGN LIGHTING GRAPHICS DISPLAY
Excellence in Distribution Since 1946
RETROFITS:
installation guide 401302-RET. This guide
can be found on the SloanLED website
under technical info or contact your
SloanLED Customer Service
Representative at 888.747.4LED.
NOTE: All materials removed must
be disposed of in accordance with
applicable local, state and federal laws.
SLO-
.10 THICK
3.25
1.37
SignBOX II Coupler dimensions: 3.25 in x
1.37 in x .10 in (82,5 mm x 34,8 mm x 2,5 mm)
2240 Yates Ave. Commerce, CA 90040
| Fax 323.803.2019 | www.IEC Delivers.com
PAGE 1 OF 3
IEC_SloanLED_SignBox2_InstallGuide_TDS.pdf

Advertisement

loading
Need help?

Need help?

Do you have a question about the SignBOX II and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SloanLED SignBOX II

  • Page 1 3.25 1.37 2. When cutting wires between modules, SignBOX II Coupler dimensions: 3.25 in x 3. Use SignBOX II Clamps (P/N 410155) and SLO-SB2-MC leaving one side longer will aid in joining SignBOX II Couplers (P/N 401330) to join 1.37 in x .10 in (82,5 mm x 34,8 mm x 2,5 mm) SLO-SB2-C product where needed.
  • Page 2 #8 (M4) tek screws. Repeat on opposite end making sure product is taut. Refer to Density Guidelines to determine SignBOX II product and installation method. Connecting Product to Power Supply Single-sided option...
  • Page 3 US patents and foreign patents pending Customer service and technical support Europe: Customer service and technical support 888.747.4LED (888.747.4533) +31 (15) 3641569 SloanLED.com • info@SloanLED.com SloanLED.com • Europe@SloanLED.com P/N 401302 Rev A 2013-07-18 2240 Yates Ave. Commerce, CA 90040 800.CALL IEC | Fax 323.803.2019 | www.IEC Delivers.com...