(13) Wait for the "Startup Completed" message to display. The setup process takes a few seconds to complete.
3.5.2
Boost Mode
Caution: This is a high power application board. Renesas recommends disabling through the software and
turning off all supplies before making connections to the board. Failure to do this could damage the board.
(1) Verify that the computer is connected to the USB to I
(a) See
Figures 3
(b) See
Figures 3
(2) Verify the jumper connections in
"jumpers" are measurement terminals and do not tolerate being shorted.
Jumper ID
J
14
TP
23
J
15
TP
24
J
Pin 2 connected
20
to J
Pin 2
21
J
26
J
35
J
1
J
1
UG073 Rev.4.00
Jun 7, 2019
Figure 21. Startup Completed
and
4
for the ISL78226EVAL1Z setup.
and
5
for the ISL78224EVAL2Z setup.
Table
4. Note: Jumpers not listed in the table are not populated. Some
Table 4. Jumper Configuration
Device
Action
ISL78226
Installed
BAT48 Bode Injection,
Jumper for normal operation
ISL78224
Installed
ISL78226
Installed
BAT12 Bode Injection,
Jumper for normal operation
ISL78224
Installed
ISL78226
Installed
Short ISET to ISHARE,
Jumper for master only operation
ISL78224
N/A
ISL78226
Installed
MCUVDD Bode Injection,
Jumper for normal operation
ISL78224
N/A
ISL78226
Switch
PD_CTRL,
Switch toward BAT48 (Phase drop ON)
Switch toward BAT12 (Phase drop OFF)
ISL78224
Jumper
PD_CTRL,
Jumper for no Phase drop
No jumper for Phase drop
ISL78224
Jumper
Phase drop OFF
No Jumper
Phase drop ON
2
C board and the evaluation board
Function
3. Functional Description