Download Print this page

Install The Bezel - Crestron FlipTop FT2 Series Quick Start Manual

Cable management system, 700 size, mechanical, pass-through lid
Hide thumbs Also See for FlipTop FT2 Series:

Advertisement

FT2-700-MECH-PTL
FlipTop™ FT2 Series Cable Management System, 700 Size, Mechanical, Pass-Through Lid

Install the Bezel

Place the bezel onto the FT2 assembly so that the retractable lid fits
inside the bezel opening. The bezel is held in place using magnets.
Operate the FlipTop Assembly
To operate the FT2-700-MECH-PTL:
1. Open the lid by sliding the lid retraction button away from the FT2
assembly. The lid retracts into the assembly.
2. Access the modules in the FT2 assembly.
3. Close the lid by lifting it vertically and returning it over the FT2
assembly.
Visit the Product Page
Scan the QR code to visit the product page.
FT2-700-MECH-PTL
www.crestron.com/model/6511980
Quick Start
7

Advertisement

loading

This manual is also suitable for:

Fliptop ft2-700-mech-ptl