Deye SUN-3.6K-SG05LP1-EU User Manual

Deye SUN-3.6K-SG05LP1-EU User Manual

Hybrid inverter
Hide thumbs Also See for SUN-3.6K-SG05LP1-EU:

Advertisement

Hybrid Inverter
SUN-3.6K-SG05LP1-EU
SUN-5K-SG05LP1-EU
SUN-6K-SG05LP1-EU
SUN-7.6K-SG05LP1-EU
SUN-8K-SG05LP1-EU
User Manual
R

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SUN-3.6K-SG05LP1-EU and is the answer not in the manual?

Questions and answers

Summary of Contents for Deye SUN-3.6K-SG05LP1-EU

  • Page 1 Hybrid Inverter SUN-3.6K-SG05LP1-EU SUN-5K-SG05LP1-EU SUN-6K-SG05LP1-EU SUN-7.6K-SG05LP1-EU SUN-8K-SG05LP1-EU User Manual...
  • Page 2: Table Of Contents

    Contents 1. Safety Introductions ……………………………………………… 2. Product instructions 02-04 ……………………………………………… 2.1 Product Overview 2.2 Product Size 2.3 Product Features 2.4 Basic System Architecture 3. Installation 05-21 …………………………………………………………… 3.1 Parts list 3.2 Mounting instructions 3.3 Battery connection 3.4 Grid connection and backup load connection 3.5 PV Connection 3.6 CT Connection 3.6.1 Meter Connection...
  • Page 3 Documents must be stored carefully and be available at all �mes. Contents may be periodically updated or revised due to product development. The informa�on in this manual is subject to change without no�ce. The latest manual can be acquired via service@deye.com.cn 1. Safety Introduc�ons Safety signs...
  • Page 4: Product Overview

    2. Product Introduc�ons This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar charging, and acceptable input voltage based on different applica�ons.
  • Page 5: Product Size

    2.2 Product Size Inverter Size - 03 -...
  • Page 6: Product Features

    2.3 Product Features - Self-consump�on and feed-in to the grid. - Auto restart while AC is recovering. - Programmable supply priority for ba�ery or grid. - Programmable mul�ple opera�on modes: On grid, off grid and UPS. - Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng. - Configurable AC/Solar/Generator Charger priority by LCD se�ng.
  • Page 7: Parts List

    3. Installa�on 3.1 Parts List Check the equipment before installa�on. Please make sure nothing is damaged in the package. You should have received the items in the following package: SStainless steel an�-collision Hybrid inverter Wall moun�ng bracket x1 bolt M6*60x4 Stainless steel moun�ng Parallel communica�on L-type Hexagon wrench...
  • Page 8 3.2 Moun�ng instruc�ons Installa�on Precau�on This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site meets below condi�ons: · Not in direct sunlight · Not in areas where highly flammable materials are stored. · Not in poten�al explosive areas. ·...
  • Page 9 ≥500mm ≥500mm For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and approx. 50cm above and below the unit. And 100cm to the front. Moun�ng the inverter Remember that this inverter is heavy! Please be careful when li�ing out from the package. Choose the recommend drill head(as shown in below pic) to drill 4 holes on the wall, 62-70mm deep.
  • Page 10 Inverter hanging plate installa�on 3.3 Ba�ery connec�on For safe opera�on and compliance, a separate DC over-current protector or disconnect device is required between the ba�ery and the inverter. In some applica�ons, switching devices may not be required but over-current protectors are s�ll required. Refer to the typical amperage in the table below for the required fuse or circuit breaker size.
  • Page 11 All wiring must be performed by a professional person. Connec�ng the ba�ery with a suitable cable is important for safe and efficient opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for recommended cables. Please follow below steps to implement ba�ery connec�on: 1.
  • Page 12 3.3.2 Func�on port defini�on DIP Switch Inverter BMS 485/ RS 485 DRMs HM G-V G-S ATS240V parallel_1 parallel_2 RS 485: RS485 port for energy meter 240V Coil communica�on. Neutral BMS 485/CAN: 485/CAN port for ba�ery Earth Bond communica�on. Batt Temp Gen start-up Sensor DRMs: for Australia market only.
  • Page 13 3.3.3 Temperature sensor connec�on for lead-acid ba�ery Inverter Temp. sensor - 11 -...
  • Page 14 3.4 Grid connec�on and backup load connec�on · Before connec�ng to the grid, a separate AC breaker must be installed between the inverter and the grid, and also between the backup load and the inverter. This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current.
  • Page 15 GEN PORT LOAD GRID GEN PORT LOAD GRID - 13 -...
  • Page 16: Pv Connection

    Be sure that AC power source is disconnected before a�emp�ng to wire it to the unit. 3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well. 4.
  • Page 17 3.5.1 PV Module Selec�on: When selec�ng proper PV modules, please be sure to consider below parameters: 1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of inverter. 2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage. 3)The PV modules used to connected to this inverter shall be Class A ra�ng cer�fied according to lEC 61730.
  • Page 18: Ct Connection

    3.6 CT Connec�on L N PE L N PE L N PE Load Grid Inverter White wire Black wire Arrow pointing Grid inverter The primary side of the CT needs to be clamped on the Grid live line. *Note:when the reading of the load power on the LCD is not correct, please reverse the CT arrow.
  • Page 19: Earth Connection(Mandatory)

    L N PE L N PE L N PE RS485 Load Grid Inverter BMS 485/ RS 485 DRMs Breaker parallel_1 parallel_2 System connec�on diagram for the Eastron meter Input Output RS 485 230V/2T 230V/2T Grid 1+COM 1+COM RS485A RS485B EASTRON SDM230 Pic 7.1 EASTRON meter Note: In final installa�on,breaker cer�fied according to IEC 60947-1 and IEC 60947-2...
  • Page 20: Wiring System For Inverter

    3.9 Wiring System for Inverter This diagram is an example for grid systems without special requirements on electrical wiring connec�on. Note: The back-up PE line and earthing bar must be grounded properly and DC Breaker effec�vely. Otherwise the back-up func�on may be abnormal when the grid fails. AC Breaker Load Battery...
  • Page 21: Typical Application Diagram Of Diesel Generator

    3.10 Typical applica�on diagram of diesel generator (Region:EU) L wire N wire PE wire GV/GS: dry contact signal for startup the diesel generator. When the "GEN signal" is ac�ve, the open contact (GV/GS) will switch on (no voltage output). If the "Signal ISLAND MODE"is �cked, the GS port will be the dry contact signal for startup HM G-V G-S ATS240V...
  • Page 22: Single Phase Parallel Connection Diagram

    3.11 Single phase parallel connec�on diagram L wire N wire PE wire Inverter No.3 L N PE L N PE L N PE (slave) BMS 485/ RS 485 Load Grid DRMs Ground parallel_1 parallel_2 Inverter ①②③ DC Breaker for battery ④...
  • Page 23: Three Phase Parallel Inverter

    3.12 Three phase Parallel Inverter -21 -...
  • Page 24: Operation

    4. OPERATION 4.1 Power ON/OFF Once the unit has been properly installed and the ba�eries are connected well, simply press On/Off bu�on(located on the le� side of the case) to turn on the unit.When system without ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and select NO ba�ery, system can s�ll work.
  • Page 25: Lcd Display Icons

    5. LCD Display Icons 5.1 Main Screen The LCD is touchscreen, below screen shows the overall informa�on of the inverter. 12/18/2020 09:21:00 1.85 0.04 -1.79 0.02 1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it turns into "comm./FXX"...
  • Page 26 5.1.1 LCD opera�on flow chart Solar Page Solar Graph Grid Page Grid Graph Inverter Page Main Screen Battery Page BMS Page Load Page Load Graph Battery Setting System Work Mode Grid Setting System Setup Gen Port Use Basic Setting Advanced Function Device info - 24 -...
  • Page 27: Solar Power Curve

    5.2 Solar Power Curve This is Solar Panel detail page. Solar ① Solar Panel Genera�on. ① ② ② Grid Tie Power: when there’s a string inverter Power: 2923W Grid Tie Power: 2923W AC couple at the grid or load side of hybrid inverter PV1-V: 0V PV2-V: 0V PV3-V: 0V...
  • Page 28: Curve Page-Solar & Load & Grid

    Li-BMS Mean Voltage:50.34V Charging Voltage :53.2V Batt Total Current:55.00A Discharging Voltage :47.0V Data Mean Temp :23.5C Charging current :50A Total SOC :38% Discharging current :25A Stand-by Dump Energy:57Ah Details SOC: 36% Data U:50.50V I:-58.02A Li-BMS Power: -2930W Charge Volt Curr Temp Energy Fault...
  • Page 29: System Setup Menu

    5.4 System Setup Menu System Setup This is System Setup page. System Work Mode Battery Setting Gen Port Grid Setting Basic Advanced Device Info. Setting Function 5.5 Basic Setup Menu Basic Setting Factory Reset: Reset all parameters of the inverter. Lock out all changes: Enable this menu for se�ng Time Syncs Beep...
  • Page 30: Battery Setup Menu

    5.6 Ba�ery Setup Menu Ba�ery capacity: it tells Deye hybrid inverter to know Battery Setting your ba�ery bank size. Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V). Batt Mode Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
  • Page 31 Generator This page tells generator output voltage, frequency, power. And, how much energy is used from generator. Power: 1392W Today=0.0 KWH Total =2.20 KWH L1: 228V Freq:50.0Hz Battery Setting Lithium Mode: This is BMS protocol.Please reference the document(Approved Ba�ery). Lithium Mode Shutdown 10%: It indicates the inverter will shutdown Batt if the SOC below this value.
  • Page 32: System Work Mode Setup Menu

    5.7 System Work Mode Setup Menu System Work Mode Work Mode Selling First: This Mode allows hybrid inverter to sell 5000 back any excess power produced by the solar panels to Selling First Max Solar Power the grid. If �me of use is ac�ve, the ba�ery energy also Work Zero Export To Load Solar Sell...
  • Page 33 Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load consump�on and charge ba�ery and feed into grid.
  • Page 34: Grid Setup Menu

    5.8 Grid Setup Menu Grid Setting Unlock Grid Se�ng: before changing the grid parameters, please enable this with password of 7777. Then it is Unlock Grid Setting allowed to change the grid parameters. Grid Mode General Standard 0/16 Grid Grid Mode: General Standard、UL1741 & IEEE1547、 Grid Frequency Set1 INV Output Voltage...
  • Page 35 Grid Setting/V(W) V(Q) V(W): It is used to adjust the inverter ac�ve power according to the set grid voltage. V(Q): It is used to adjust the inverter reac�ve power V(W) V(Q) according to the set grid voltage. Lock-in/Pn Lock-out/Pn This func�on is used to adjust inverter output power Grid (ac�ve power and reac�ve power) when grid voltage Set5...
  • Page 36: The Method Of Cei-021 Self-Check

    5.9 The method of CEI-021 Standard Self-Check Grid Setting Firstly, �ck the “CEI-021” and “Single phase/50Hz” Unlock Grid Setting on the grid se�ng menu. Grid Mode CEI 0-21 4/16 Grid Set1 Grid Frequency INV Output Voltage 50HZ 240V 60HZ 220V 230V 200V Grid Type...
  • Page 37 Inverter ID : 2012041234 During the self-test process, all the indicators Self-Test OK will be on and the alarm keeps on. Testing 59.S1... Test 59.S1 OK! When all the test items shows OK, Testing 59.S2... Test 59.S2 OK! which means the self-test is completed Testing 27.S1...
  • Page 38: Generator Port Use Setup Menu

    5.10 Generator Port Use Setup Menu GEN PORT USE Generator input rated power: allowed Max. power from diesel generator. Mode AC couple on grid side GEN connect to grid input: connect the diesel generator to the Generator Input grid input port. AC couple on load side Rated Power PORT...
  • Page 39: Device Info Setup Menu

    Advanced Function Ex_Meter For CT: when in Three phase system with CHNT Three phase energy meter (DTSU666), click corresponding phase where hybrid inverter is connected. e.g. when the Modbus SN Parallel A Phase hybrid inverter output connects to A phase, please click A Master B Phase Phase.
  • Page 40 Mode I:Basic AC cable DC cable COM cable Backup Load On-Grid Home Load Solar Battery Grid Mode II: With Generator AC cable DC cable Solar Backup Load On-Grid Home Load Grid Battery Generator Mode III: With Smart-Load AC cable DC cable Solar Backup Load On-Grid Home Load...
  • Page 41: Fault Information And Processing

    On-Load+AC couple AC cable DC cable On-Grid Inverter Backup Load Solar On-Grid Home Load Battery Grid Smart Load On-Grid+AC couple AC cable DC cable Backup Load Solar On-Grid Inverter On-Grid Home Load Battery Grid Smart Load The 1st priority power of the system is always the PV power, then 2nd and 3rd priority power will be the ba�ery bank or grid according to the se�ngs.
  • Page 42 Error code Description Solutions 1. When inverter is in Split phase(120/240Vac) or three-phase GFDI _Relay_Failure system (120/208Vac) system, the backup load port N line needs to connect ground; 2. If the fault still exists, please contact us for help. 1. When the grid type and frequency changed it will report F13; 2.
  • Page 43 Error code Description Solutions 1. Check the backup load connected, make sure it is in allowed power range; AC Overcurrent fault 2. If the fault still exists, please contact us for help. No Utility 1. Please confirm grid is lost or not; No AC grid 2.
  • Page 44 Under the guidance of our company, customers return our products so that our company can provide service of maintenance or replacement of products of the same value. Customers need to pay the necessary freight and other related costs. Any replacement or repair of the product will cover the remaining warranty period of the product.
  • Page 45: Datasheet

    9. Datasheet SUN-3.6K- SUN-5K- SUN-6K- SUN-7.6K- SUN-8K- Model SG05LP1-EU SG05LP1-EU SG05LP1-EU SG05LP1-EU SG05LP1-EU Battery Input Date Ba�ery Type Lead-acid or Li-lon Ba�ery Voltage Range(V) 40-60V 120A 135A 190A 190A Max. Charging Current(A) 120A 135A 190A 190A Max. Discharging Current(A) Charging Curve 3 Stages / Equaliza�on External Temperature Sensor Charging Strategy for Li-lon Ba�ery...
  • Page 46 Certifications and Standards VDE4105,IEC61727/62116,VDE0126,AS4777.2,CEI 0 21,EN50549-1, Grid Regula�on G98,G99,C10-11,UNE217002,NBR16149/NBR16150 IEC/EN 62109-1,IEC/EN 62109-2,IEC/EN 61000-6-1, EMC/Safety Regula�on IEC/EN 61000-6-2,IEC/EN 61000-6-3,IEC/EN 61000-6-4 General Data Opera�ng Temperature Range(℃) -40~60℃, >45℃ Dera�ng Cooling Smart cooling Noise(dB) <30 dB Communica�on with BMS RS485; CAN Weight(kg) Cabinet size(mm) 330W×580H×232D (Excluding connectors and brackets) Protec�on Degree IP65...
  • Page 47 10. Appendix I Defini�on of RJ45 Port Pin for BMS 485/CAN. BMS 485/CAN Pin 1 2 3 4 5 6 7 8 485_B 485_A GND_485 CAN-H CAN-L GND_485 485_A 485_B BMS 485/CAN Port - 45-...
  • Page 48 Defini�on of RJ45 Port Pin for RS 485. This port is used to communicate with energy meter. RS 485 Pin 1 2 3 4 5 6 7 8 485-B 485-A RS 485 Port - 46-...
  • Page 49 RS232 WIFI/RS232 D-GND 12Vdc WIFI/RS232 This RS232 port is used to connect the wifi datalogger - 47-...
  • Page 50: Appendix

    11. Appendix II 1. Split Core Current Transformer (CT) dimension: (mm) 2. Secondary output cable length is 4m. Lead Outside Ver: 2.2, 2023-04-21 - 48-...
  • Page 51 Add: No.26 South YongJiang Road, Daqi, Beilun, NingBo, China. Tel: +86 (0) 574 8622 8957 Fax: +86 (0) 574 8622 8852 E-mail: service@deye.com.cn Web: www.deyeinverter.com...

Table of Contents

Save PDF