Deye SUN-3.6K-SG05LP1-AU User Manual

Deye SUN-3.6K-SG05LP1-AU User Manual

Hybrid inverter

Advertisement

Hybrid Inverter
SUN-3.6K-SG05LP1-AU
SUN-5K-SG05LP1-AU
SUN-6K-SG05LP1-AU
SUN-7.6K-SG05LP1-AU
SUN-8K-SG05LP1-AU
User Manual
R

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SUN-3.6K-SG05LP1-AU and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Deye SUN-3.6K-SG05LP1-AU

  • Page 1 Hybrid Inverter SUN-3.6K-SG05LP1-AU SUN-5K-SG05LP1-AU SUN-6K-SG05LP1-AU SUN-7.6K-SG05LP1-AU SUN-8K-SG05LP1-AU User Manual...
  • Page 2: Table Of Contents

    Contents 1. Safety Introductions ……………………………………………… 2. Product instructions ……………………………………………… ………………………………………………………… 2.1 Product Overview ………………………………………………………… 2.2 Product Size ………………………………………………………… 2.3 Product Features …………………………………………………… 2.4 Basic System Architecture Maintenance of the System ………………………………………………… 3. Installation …………………………………………………………… …………………………………………………………………… 3.1 Parts list ……………………………………………………… 3.2 Mounting instructions ………………………………………………………...
  • Page 3: Safety Introductions

    Contents may be periodically updated or revised due to product development. The informa�on in this manual is subject to change without no�ce. The latest manual can be acquired via service@deye.com.cn 1. Safety Introduc�ons · This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual for future reference.
  • Page 4: Product Overview

    2.1 Product Overview 1: Inverter Indicators 7: Parallel port 13: PV input with two MPPT 8: Func�on Port 2: LCD display 14: Ba�ery 9: DRMs Port 3: Func�on Bu�ons 15: Temperature sensor 10: Generator input 4: Ba�ery input connectors 16: WiFi Interface 11: Load 5: RS 485 Port 12: Grid...
  • Page 5: Product Size

    2.2 Product Size Inverter Size Moun�ng bracket - 03 -...
  • Page 6: Product Features

    2.3 Product Features - Self-consump�on and feed-in to the grid. - Auto restart while AC is recovering. - Programmable supply priority for ba�ery or grid. - Programmable mul�ple opera�on modes: On grid, off grid and UPS. - Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng. - Configurable AC/Solar/Generator Charger priority by LCD se�ng.
  • Page 7: Installation

    3. Installa�on 3.1 Parts List Check the equipment before installa�on. Please make sure nothing is damaged in the package. You should have received the items in the following package: SStainless steel an�-collision Hybrid inverter Wall moun�ng bracket x1 bolt M6*60x4 Stainless steel moun�ng Parallel communica�on L-type Hexagon wrench...
  • Page 8: Mounting Instructions

    3.2 Moun�ng instruc�ons Installa�on Precau�on This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site meets below condi�ons: · Not in direct sunlight · Not in areas where highly flammable materials are stored. · Not in poten�al explosive areas. ·...
  • Page 9 ≥500mm ≥500mm For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and approx. 50cm above and below the unit. And 100cm to the front. Moun�ng the inverter Remember that this inverter is heavy! Please be careful when li�ing out from the package. Choose the recommend drill head(as shown in below pic) to drill 4 holes on the wall, 62-70mm deep.
  • Page 10: Battery Connection

    Inverter hanging plate installa�on 3.3 Ba�ery connec�on For safe opera�on and compliance, a separate DC over-current protector or disconnect device is required between the ba�ery and the inverter. In some applica�ons, switching devices may not be required but over-current protectors are s�ll required. Refer to the typical amperage in the table below for the required fuse or circuit breaker size.
  • Page 11 All wiring must be performed by a professional person. Connec�ng the ba�ery with a suitable cable is important for safe and efficient opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for recommended cables. Please follow below steps to implement ba�ery connec�on: 1.
  • Page 12 3.3.2 Func�on port defini�on DIP Switch Inverter RS 485 BMS 485 /CAN DRMs HM G-V G-S ATS240V parallel_1 parallel_2 RS485: for energy meter communica�on. 240V Coil BMS 485/CAN: 485/CAN port for ba�ery Neutral communica�on. Earth Bond DRM port:Logic interface for AS/ Batt Temp Gen start-up Sensor...
  • Page 13 3.3.3 Temperature sensor connec�on for lead-acid ba�ery Inverter Temp. sensor - 11 -...
  • Page 14: Grid Connection And Backup Load Connection

    3.4 Grid connec�on and backup load connec�on · Before connec�ng to grid, please install a separate AC breaker between inverter and grid. Also, it is recommended to install an AC breaker between backup load and inverter.This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current.
  • Page 15 GEN PORT LOAD GRID GEN PORT LOAD GRID - 13 -...
  • Page 16: Pv Connection

    Be sure that AC power source is disconnected before a�emp�ng to wire it to the unit. 3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well. 4.
  • Page 17: Ct Connection

    3.5.1 PV Module Selec�on: When selec�ng proper PV modules, please be sure to consider below parameters: 1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of inverter. 2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage. 3.6KW- 5KW- 6KW-...
  • Page 18: Meter Connection

    *Note:when the reading of the load power on the LCD is not correct, please reverse the CT arrow. 3.6.1 Meter Connec�on RS485 L N PE L N PE L N PE Load Grid Inverter Breaker RS 485 BMS 485 /CAN DRMs parallel_1 parallel_2 System connec�on diagram for the CHNT meter...
  • Page 19: Earth Connection(Mandatory)

    Note: Iinverter has built–in leakage current detec�on circuit,If an external RCD is required, a type-A RCD with rated residual current of 300mA or higher is suggested.Otherwise inverter may not work properly 3.7 Earth Connec�on(mandatory) Ground cable shall be connected to ground plate on grid side this prevents electric shock. if the original protec�ve conductor fails.
  • Page 20: Wiring System For Inverter

    3.9 Wiring System for Inverter This diagram is an example for grid systems without special requirements on electrical wiring connec�on. Note: The back-up PE line and earthing bar must be grounded properly and effec�vely. DC Breaker Otherwise the back-up func�on may be abnormal when the grid fails. In final installa�on, breaker cer�fied according to AS60947.3 shall be installed with the equipment.
  • Page 21: Typical Application Diagram Of Diesel Generator

    3.10 Typical applica�on diagram of diesel generator L wire N wire PE wire GV/GS: dry contact signal for startup the diesel generator. When the "GEN signal" is ac�ve, the open contact (GV/GS) will switch on (no voltage output). If the "Signal ISLAND MODE"is �cked, the GS port will be the dry contact signal for startup HM G-V G-S ATS240V...
  • Page 22: Operation

    4. OPERATION 4.1 Power ON/OFF Once the unit has been properly installed and the ba�eries are connected well, simply press On/Off bu�on(located on the le� side of the case) to turn on the unit.When system without ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and select NO ba�ery, system can s�ll work.(NOTE: Choose the correct country code.
  • Page 23: Lcd Display Icons

    5. LCD Display Icons 5.1 Main Screen The LCD is touchscreen, below screen shows the overall informa�on of the inverter. 12/18/2020 09:21:00 1.85 0.04 -1.79 0.02 1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it turns into "comm./FXX"...
  • Page 24 5.1.1 LCD opera�on flow chart Solar Page Solar Graph Grid Page Grid Graph Inverter Page Main Screen Battery Page BMS Page Load Page Load Graph Battery Setting System Work Mode Grid Setting System Setup Gen Port Use Basic Setting Advanced Function Device info - 22 -...
  • Page 25: Solar Power Curve

    5.2 Solar Power Curve Solar This is Solar Panel detail page. ③ ① ① Solar Panel Genera�on. Power: 1560W Today=8.0 KWH Voltage, Current, Power for each MPPT. ② ② PV1-V: 286V PV2-V: 45V Total =12.00 KWH ③ Solar Panel energy for Day and Total. PV1-|: 5.5A PV2-|: 0.0A P1: 1559W...
  • Page 26: Curve Page-Solar & Load & Grid

    Li-BMS Mean Voltage:50.34V Charging Voltage :53.2V Batt Total Current:55.00A Discharging Voltage :47.0V Data Mean Temp :23.5C Charging current :50A Total SOC :38% Discharging current :25A Stand-by Dump Energy:57Ah Details SOC: 36% Data U:50.50V I:-58.02A Li-BMS Power: -2930W Charge Volt Curr Temp Energy Fault...
  • Page 27: System Setup Menu

    5.4 System Setup Menu System Setup This is System Setup page. System Work Mode Battery Setting Gen Port Grid Setting Basic Advanced Device Info. Setting Function 5.5 Basic Setup Menu Basic Setting Factory Reset: Reset all parameters of the inverter. Lock out all changes: Enable this menu for se�ng Time Syncs Beep...
  • Page 28: Battery Setup Menu

    5.6 Ba�ery Setup Menu Battery Setting Ba�ery capacity: it tells Deye hybrid inverter to know your ba�ery bank size. Batt Mode Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V). Lithium 400Ah Batt Capacity Batt Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
  • Page 29 Generator This page tells generator output voltage, frequency, power. And, how much energy is used from generator. Power: 1392W Today=0.0 KWH Total =2.20 KWH L1: 228V Freq:50.0Hz Battery Setting Lithium Mode: This is BMS protocol.Please reference the document(Approved Ba�ery). Lithium Mode Shutdown 10%: It indicates the inverter will shutdown Batt if the SOC below this value.
  • Page 30: System Work Mode Setup Menu

    5.7 System Work Mode Setup Menu System Work Mode Work Mode Selling First: This Mode allows hybrid inverter to sell 5000 back any excess power produced by the solar panels to Selling First Max Solar Power the grid. If �me of use is ac�ve, the ba�ery energy also Work Zero Export To Load Solar Sell...
  • Page 31: Grid Setup Menu

    Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load consump�on and charge ba�ery and feed into grid.
  • Page 32 5.8.2 Grid Standard Selec�on Grid Setting/Grid code selection Grid Mode:General Standard、UL1741 & IEEE1547、 CPUC RULE21、SRD-UL-1741、CEI 0-21、 Australia A 、 Grid Mode General Standard 0/11 Australia B、 Australia C、EN50549_CZ-PPDS(>16A)、 Phase Type Grid Frequency 50HZ Grid NewZealand、VDE4105、OVE-Direc�ve R25. Set1 0/120/240 60HZ Please follow the local grid code and then choose the 0/240/120 corresponding grid standard.
  • Page 33 Default volt-var se�ngs for different regions are shown in the following table: Voltage 220V 240V 207V 258V Australia A Inverter maximum ac�ve 44%supplying 60%absorbing power output level(P) % of S rated Voltage 220V 235V 205V 255V Australia B Inverter maximum ac�ve 30%supplying 40%supplying power output level(P) % of S...
  • Page 34 If the Time Syncs Beep Auto Dim engineer does not know the password, please Year Month Basic contact your distributor or Deye. 2019 Hour Minute 24-Hour Factory Reset Lock out all changes 5.8.2 Grid Parameter Check A�er steps above, customers can see firmware version on main page grid parameters in grid...
  • Page 35: Generator Port Use Setup Menu

    5.9 Generator Port Use Setup Menu GEN PORT USE Generator input rated power: allowed Max. power from diesel generator. Mode AC couple on grid side GEN connect to grid input: connect the diesel generator to the Generator Input grid input port. AC couple on load side Rated Power PORT...
  • Page 36: Device Info Setup Menu

    Advanced Function Ex_Meter For CT: when in Three phase system with CHNT Three phase energy meter (DTSU666), click corresponding Modbus SN Parallel A Phase phase where hybrid inverter is connected. e.g. when the Master B Phase Paral. hybrid inverter output connects to A phase, please click A Set3 Slave C Phase...
  • Page 37 Mode II: With Generator AC cable DC cable Solar Backup Load On-Grid Home Load Grid Battery Generator Mode III: With Smart-Load AC cable DC cable Solar Backup Load On-Grid Home Load Grid Battery Smart Load Mode IV: AC Couple On-Gen+AC couple AC cable DC cable On-Grid Home Load...
  • Page 38: Fault Information And Processing

    On-Load+AC couple AC cable DC cable On-Grid Inverter Backup Load Solar On-Grid Home Load Battery Grid Smart Load On-Grid+AC couple AC cable DC cable Backup Load Solar On-Grid Home Load On-Grid Inverter Battery Grid Smart Load The 1st priority power of the system is always the PV power, then 2nd and 3rd priority power will be the ba�ery bank or grid according to the se�ngs.
  • Page 39 Error code Description Solutions 1. When inverter is in Split phase(120/240Vac) or three-phase GFDI _Relay_Failure system (120/208Vac) system, the backup load port N line needs to connect ground; 2. If the fault still exists, please contact us for help. 1. When the grid type and frequency changed it will report F13; 2.
  • Page 40 Error code Description Solutions 1. Check the backup load connected, make sure it is in allowed power range; AC Overcurrent fault 2. If the fault still exists, please contact us for help. No Utility 1. Please confirm grid is lost or not; No AC grid 2.
  • Page 41: Limitation Of Liability

    Under the guidance of our company, customers return our products so that our company can provide service of maintenance or replacement of products of the same value. Customers need to pay the necessary freight and other related costs. Any replacement or repair of the product will cover the remaining warranty period of the product.
  • Page 42: Datasheet

    9. Datasheet SUN-3.6K- SUN-5K- SUN-6K- SUN-7.6K- SUN-8K- Model SG05LP1-AU SG05LP1-AU SG05LP1-AU SG05LP1-AU SG05LP1-AU Battery Input Date Ba�ery Type Lead-acid or Li-lon Ba�ery Voltage Range(V) 40-60V 120A 135A 190A 190A Max. Charging Current(A) 120A 135A 190A 190A Max. Discharging Current(A) Charging Curve 3 Stages / Equaliza�on External Temperature Sensor Charging Strategy for Li-lon Ba�ery...
  • Page 43: Package And Transport Inverter

    Certifications and Standards VDE4105,IEC61727/62116,VDE0126,AS4777.2,CEI 0 21,EN50549-1, Grid Regula�on G98,G99,C10-11,UNE217002,NBR16149/NBR16150 IEC/EN 62109-1,IEC/EN 62109-2,IEC/EN 61000-6-1, EMC/Safety Regula�on IEC/EN 61000-6-2,IEC/EN 61000-6-3,IEC/EN 61000-6-4 General Data Opera�ng Temperature Range(℃) -40~60℃, >45℃ Dera�ng Cooling Smart cooling Noise(dB) <30 dB Communica�on with BMS RS485; CAN Weight(kg) Size(mm) 330W×580H×232D Protec�on Degree IP65...
  • Page 44 12. Appendix I Defini�on of RJ45 Port Pin for BMS RS485 Pin CAN Pin 1 2 3 4 5 6 7 8 RS485B RS485A CANH CANL RS485A RS485B BMS 485 Port CAN Port - 42 -...
  • Page 45 Defini�on of RJ45 Port Pin for RS485. 1 2 3 4 5 6 7 8 This port is used to communicate with energy meter RS485 Pin RS485 Port RS485B RS485A 1 2 3 4 5 6 7 8 DRM port Defini�on of RJ45 Port Pin for DRM Port Modbus port DRM1/5...
  • Page 46 RS232 WIFI/RS232 D-GND 12Vdc WIFI/RS232 This RS232 port is used to connect the wifi datalogger - 44 -...
  • Page 47: Appendix

    13. Appendix II 1. Split Core Current Transformer (CT) dimension: (mm) 2. Secondary output cable length is 4m. Lead Outside Ver: 2.2, 2022-10-29 - 45 -...
  • Page 48 Add: No.26-30, South Yongjiang Road, Beilun, 315806, Ningbo, China Tel: +86 (0) 574 8622 8957 Fax: +86 (0) 574 8622 8852 E-mail: service@deye.com.cn Web: www.deyeinverter.com...

Table of Contents