Contents 1. Safety Introductions ……………………………………………… 2. Product instructions 02-06 ……………………………………………… 2.1 Product Overview and Size 2.2 Product Features 2.3 Basic System Architecture 3. Installation 07-22 …………………………………………………………… 3.1 Parts list 3.2 Mounting instructions 3.3 Battery connection 3.4 Grid connection and backup load connection 3.5 PV Connection 3.6 CT Connection 3.6.1 Meter Connection...
Page 3
Documents must be stored carefully and be available at all �mes. Contents may be periodically updated or revised due to product development. The informa�on in this manual is subject to change without no�ce. The latest manual can be acquired via service@deye.com.cn 1. Safety Introduc�ons Safety signs...
2. Product Introduc�ons This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar charging, and acceptable input voltage based on different applica�ons.
2.2 Product Features - Self-consump�on and feed-in to the grid. - Auto restart while AC is recovering. - Programmable supply priority for ba�ery or grid. - Programmable mul�ple opera�on modes: On grid, off grid and UPS. - Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng. - Configurable AC/Solar/Generator Charger priority by LCD se�ng.
3. Installa�on 3.1 Parts List Check the equipment before installa�on. Please make sure nothing is damaged in the package. You should have received the items in the following package: Stainless steel an�-collision Hybrid inverter Wall moun�ng bracket x1 bolt M8×80 Stainless steel moun�ng Parallel communica�on L-type Hexagon wrench...
Page 10
3.2 Moun�ng instruc�ons Installa�on Precau�on This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site meets below condi�ons: · Not in direct sunlight · Not in areas where highly flammable materials are stored. · Not in poten�al explosive areas. ·...
Page 11
≥500mm ≥500mm For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and approx. 50cm above and below the unit. And 100cm to the front. Moun�ng the inverter Remember that this inverter is heavy! Please be careful when li�ing out from the package. Choose the recommend drill head(as shown in below pic) to drill 4 holes on the wall, 82-90mm deep.
Page 12
Inverter hanging plate installa�on 3.3 Ba�ery connec�on For safe opera�on and compliance, a separate DC over-current protector or disconnect device is required between the ba�ery and the inverter. In some applica�ons, switching devices may not be required but over-current protectors are s�ll required. Refer to the typical amperage in the table below for the required fuse or circuit breaker size.
Page 13
All wiring must be performed by a professional person. Connec�ng the ba�ery with a suitable cable is important for safe and efficient opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for recommended cables. Please follow below steps to implement ba�ery connec�on: 1.
Page 14
3.3.2 Func�on port defini�on DIP Switch Inverter L ATS240V TEMP:1,2 CT:3,4 G-start:5,6 RS485/CAN Meter G-valve:7,8 1 2 3 4 5 6 7 8 parallel_1 parallel_2 RS485/CAN: CAN port for ba�ery communica�on. Meter: for energy meter communica�on. Parallel 1: Parallel communica�on port 1 (CAN interface).
Page 15
3.3.3 Temperature sensor connec�on for lead-acid ba�ery Inverter Temp. sensor (3-5)K-SG04LP1-EU 6K-SG04LP1-EU - 13 -...
Page 16
3.4 Grid connec�on and backup load connec�on · Before connec�ng to the grid, a separate AC breaker must be installed between the inverter and the grid, and also between the backup load and the inverter. This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current.
Be sure that AC power source is disconnected before a�emp�ng to wire it to the unit. 3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well. 4.
3.5.1 PV Module Selec�on: When selec�ng proper PV modules, please be sure to consider below parameters: 1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of inverter. 2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage. 3) The PV modules used to connected to this inverter shall be Class A ra�ng cer�fied according to lEC 61730.
3.6.1 Meter Connec�on Inverter Breaker RS485/CAN Meter System connec�on diagram for the CHNT meter Grid Grid input Output RS 485 DDSU666 DIN-RAIL METER RS485A 230V 5(60) A 800imp/kWh RS485B CHNT DDSU666 CHINT meter Inverter RS485/CAN Meter Breaker System connec�on diagram for the Eastron meter Input Output RS 485...
Note: In final installa�on,breaker cer�fied according to IEC 60947-1 and IEC 60947-2 shall be installed with the equipment. 3.7 Earth Connec�on(mandatory) Ground cable shall be connected to ground plate on grid side this prevents electric shock. if the original protec�ve conductor fails. (3-5)K-SG04LP1-EU 6K-SG04LP1-EU 3.8 WIFI Connec�on...
3.9 Wiring System for Inverter This diagram is an example for grid systems without special requirements on electrical wiring connec�on. Note: The back-up PE line and earthing bar must be grounded properly and DC Breaker effec�vely. Otherwise the back-up func�on may be abnormal when the grid fails. AC Breaker Load Battery...
3.10 Single phase parallel connec�on diagram L wire N wire PE wire Inverter No.3 (slave) RS485/CAN Meter Ground parallel_1 parallel_2 Inverter Inverter ④ ① DC No.2 Breaker ⑤ (slave) ①②③ DC Breaker for battery SUN 3K-SG:90A DC breaker SUN 3.6K-SG: 120A DC breaker ②...
3.11 Three phase Parallel Inverter ①②③ DC Breaker for battery SUN 3K-SG:90A DC breaker SUN 3.6K-SG: 120A DC breaker SUN 5K-SG: 150A DC breaker SUN 6K-SG:200A DC breaker ⑤ AC Breaker for grid port SUN 3K-SG: 40A AC breaker SUN 3.6K-SG: 40A AC breaker SUN 5K-SG: 40A AC breaker SUN 6K-SG: 40A AC breaker ④...
4. OPERATION 4.1 Power ON/OFF Once the unit has been properly installed and the ba�eries are connected well, simply press On/Off bu�on(located on the le� side of the case) to turn on the unit.When system without ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and select NO ba�ery, system can s�ll work.
5. LCD Display Icons 5.1 Main Screen The LCD is touchscreen, below screen shows the overall informa�on of the inverter. 12/18/2020 09:21:00 1.85 0.04 -1.79 0.02 1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it turns into "comm./FXX"...
Page 27
5.1.1 LCD opera�on flow chart Solar Page Solar Graph Grid Page Grid Graph Inverter Page Main Screen Battery Page BMS Page Load Page Load Graph Battery Setting System Work Mode Grid Setting System Setup Gen Port Use Basic Setting Advanced Function Device info - 25 -...
5.2 Solar Power Curve This is Solar Panel detail page. Solar ① Solar Panel Genera�on. ① ② ② Grid Tie Power: when there’s a string inverter Power: 2923W Grid Tie Power: 2923W AC couple at the grid or load side of hybrid inverter PV1-V: 0V PV2-V: 0V PV3-V: 0V...
Li-BMS Mean Voltage:50.34V Charging Voltage :53.2V Batt Total Current:55.00A Discharging Voltage :47.0V Data Mean Temp :23.5C Charging current :50A Total SOC :38% Discharging current :25A Stand-by Dump Energy:57Ah Details SOC: 36% Data U:50.50V I:-58.02A Li-BMS Power: -2930W Charge Volt Curr Temp Energy Fault...
5.4 System Setup Menu System Setup This is System Setup page. System Work Mode Battery Setting Gen Port Grid Setting Basic Advanced Device Info. Setting Function 5.5 Basic Setup Menu Basic Setting Factory Reset: Reset all parameters of the inverter. Lock out all changes: Enable this menu for se�ng Time Syncs Beep...
5.6 Ba�ery Setup Menu Ba�ery capacity: it tells Deye hybrid inverter to know Battery Setting your ba�ery bank size. Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V). Batt Mode Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
Page 32
Generator This page tells generator output voltage, frequency, power. And, how much energy is used from generator. Power: 1392W Today=0.0 KWH Total =2.20 KWH L1: 228V Freq:50.0Hz Battery Setting Lithium Mode: This is BMS protocol.Please reference the document(Approved Ba�ery). Lithium Mode Shutdown 10%: It indicates the inverter will shutdown Batt if the SOC below this value.
5.7 System Work Mode Setup Menu System Work Mode Work Mode Selling First: This Mode allows hybrid inverter to sell 5000 back any excess power produced by the solar panels to Selling First Max Solar Power the grid. If �me of use is ac�ve, the ba�ery energy also Work Zero Export To Load Solar Sell...
Page 34
Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load consump�on and charge ba�ery and feed into grid.
5.8 Grid Setup Menu Grid Setting Unlock Grid Se�ng: before changing the grid parameters, please enable this with password of 7777. Then it is Unlock Grid Setting allowed to change the grid parameters. Grid Mode General Standard 0/16 Grid Grid Mode: General Standard、UL1741 & IEEE1547、 Set1 Grid Frequency INV Output Voltage...
Page 36
Grid Setting/V(W) V(Q) V(W): It is used to adjust the inverter ac�ve power according to the set grid voltage. V(Q): It is used to adjust the inverter reac�ve power V(W) V(Q) according to the set grid voltage. Lock-in/Pn Lock-out/Pn This func�on is used to adjust inverter output power Grid (ac�ve power and reac�ve power) when grid voltage Set5...
5.9 The method of CEI-021 Standard Self-Check Grid Setting Firstly, �ck the “CEI-021” and “Single phase/50Hz” Unlock Grid Setting on the grid se�ng menu. Grid Mode CEI 0-21 4/16 Grid Set1 Grid Frequency INV Output Voltage 50HZ 240V 60HZ 220V 230V 200V Grid Type...
Page 38
Inverter ID : 2012041234 During the self-test process, all the indicators Self-Test OK will be on and the alarm keeps on. Testing 59.S1... Test 59.S1 OK! When all the test items shows OK, Testing 59.S2... Test 59.S2 OK! which means the self-test is completed Testing 27.S1...
5.10 Generator Port Use Setup Menu GEN PORT USE Generator input rated power: allowed Max. power from diesel generator. Mode AC couple on grid side GEN connect to grid input: connect the diesel generator to the Generator Input grid input port. AC couple on load side PORT Rated Power...
Advanced Function Ex_Meter For CT: when in Three phase system with CHNT Three phase energy meter (DTSU666), click corresponding phase where hybrid inverter is connected. e.g. when the Modbus SN Parallel A Phase hybrid inverter output connects to A phase, please click A Master B Phase Phase.
Page 41
Mode I:Basic AC cable DC cable COM cable Backup Load On-Grid Home Load Solar Battery Grid Mode II: With Generator AC cable DC cable Solar Backup Load On-Grid Home Load Grid Battery Generator Mode III: With Smart-Load AC cable DC cable On-Grid Home Load Grid Solar...
On-Load+AC couple AC cable DC cable On-Grid Inverter Backup Load Solar On-Grid Home Load Battery Grid Smart Load On-Grid+AC couple AC cable DC cable Backup Load Solar On-Grid Home Load On-Grid Inverter Battery Grid Smart Load The 1st priority power of the system is always the PV power, then 2nd and 3rd priority power will be the ba�ery bank or grid according to the se�ngs.
Page 43
Error code Description Solutions 1. When inverter is in Split phase(120/240Vac) or three-phase GFDI _Relay_Failure system (120/208Vac) system, the backup load port N line needs to connect ground; 2. If the fault still exists, please contact us for help. 1. When the grid type and frequency changed it will report F13; 2.
Page 44
Error code Description Solutions 1. Check the backup load connected, make sure it is in allowed power range; ACOvercurrent fault 2. If the fault still exists, please contact us for help. No Utility 1. Please confirm grid is lost or not; No AC grid 2.
Page 45
Under the guidance of our company, customers return our products so that our company can provide service of maintenance or replacement of products of the same value. Customers need to pay the necessary freight and other related costs. Any replacement or repair of the product will cover the remaining warranty period of the product.
9. Datasheet SUN-3K- SUN-3K- SUN-3.6K- SUN-5K- SUN-6K- Model SG04LP1-24-EU SG04LP1-EU SG04LP1-EU SG04LP1-EU SG04LP1-EU Battery Input Date Ba�ery Type Lead-acid or Li-Ion Ba�ery Voltage Range(V) 20-30V 40-60V Max. Charging Current(A) 140A 120A 135A Max. Discharging Current(A) 140A 120A 135A Charging Curve 3 Stages / Equaliza�on External Temperature Sensor Op�onal...
Page 47
SUN-3K- SUN-3K- SUN-3.6K- SUN-5K- SUN-6K- Model SG04LP1-24-EU SG04LP1-EU SG04LP1-EU SG04LP1-EU SG04LP1-EU Certifications and Standards VDE4105,IEC61727/62116,VDE0126,AS4777.2,CEI 0 21,EN50549-1, Grid Regula�on G98,G99,C10-11,UNE217002,NBR16149/NBR16150 IEC/EN 62109-1,IEC/EN 62109-2,IEC/EN 61000-6-1, EMC/Safety Regula�on IEC/EN 61000-6-2,IEC/EN 61000-6-3,IEC/EN 61000-6-4 General Data Opera�ng Temperature Rande(℃) -40~60℃, >45℃ Dera�ng Cooling Smart cooling Noise(dB) <30 dB(A) Communica�on with BMS...
Page 48
RS485/CAN Port Meter port This port is used to connect the energy meter. 1 2 3 4 5 6 7 8 Meter Pin 485-B 485-A 485-B 485-A 485-A 485-B - 46 -...