Contents 1. Safety Introductions ……………………………………………… 2. Product instructions 01-04 ……………………………………………… 2.1 Product Overview 2.2 Product Size 2.3 Product Features 2.4 Basic System Architecture 2.5 Maintenance of the System 3. Installation 05-20 …………………………………………………………… 3.1 Parts list 3.2 Mounting instructions 3.3 Battery connection 3.4 Grid connection and backup load connection 3.5 PV Connection 3.6 CT Connection...
Page 3
About This Manual The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and maintenance. The manual cannot include complete informa�on about the photovoltaic (PV) system. How to Use This Manual Read the manual and other related documents before performing any opera�on on the inverter. Documents must be stored carefully and be available at all �mes.
2.3 Product Features - Self-consump�on and feed-in to the grid. - Auto restart while AC is recovering. - Programmable supply priority for ba�ery or grid. - Programmable mul�ple opera�on modes: On grid, off grid and UPS. - Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng. - Configurable AC/Solar/Generator Charger priority by LCD se�ng.
3. Installa�on 3.1 Parts List Check the equipment before installa�on. Please make sure nothing is damaged in the package. You should have received the items in the following package: Stainless steel an�-collision Hybrid inverter Wall moun�ng bracket x1 bolt M8×80 Stainless steel moun�ng Parallel communica�on L-type Hexagon wrench...
Page 8
3.2 Moun�ng instruc�ons Installa�on Precau�on This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site meets below condi�ons: · Not in direct sunlight · Not in areas where highly flammable materials are stored. · Not in poten�al explosive areas. ·...
Page 9
≥500mm ≥500mm For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and approx. 50cm above and below the unit. And 100cm to the front. Moun�ng the inverter Remember that this inverter is heavy! Please be careful when li�ing out from the package. Choose the recommend drill head(as shown in below pic) to drill 4 holes on the wall, 82-90mm deep.
Page 10
Inverter hanging plate installa�on 3.3 Ba�ery connec�on For safe opera�on and compliance, a separate DC over-current protector or disconnect device is required between the ba�ery and the inverter. In some applica�ons, switching devices may not be required but over-current protectors are s�ll required. Refer to the typical amperage in the table below for the required fuse or circuit breaker size.
Page 11
All wiring must be performed by a professional person. Connec�ng the ba�ery with a suitable cable is important for safe and efficient opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for recommended cables. Please follow below steps to implement ba�ery connec�on: 1.
Page 12
3.3.2 Func�on port defini�on DIP Switch Inverter 1 2 3 4 5 6 7 8 BMS CAN RS 485 Meter parallel_1 parallel_2 HM G-V G-S BMS CAN: CAN port for ba�ery communica�on. *RS485: for energy meter communica�on. Batt Temp *Some hardware versions don't have this port. Gen start-up Sensor N/O Relay...
Page 13
3.3.3 Temperature sensor connec�on for lead-acid ba�ery Inverter Temp. sensor - 11 -...
Page 14
3.4 Grid connec�on and backup load connec�on · Before connec�ng to grid, please install a separate AC breaker between inverter and grid. Also, it is recommended that installs an AC breaker between backup load and inverter.This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current.
Be sure that AC power source is disconnected before a�emp�ng to wire it to the unit. 3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well. 4.
3KW- 3KW- 3.6KW- 5KW- 6KW- Inverter Model SG04LP1-24 SG04LP1 SG04LP1 SG04LP1 SG04LP1 PV Input Voltage 370V (125V~500V) PV Array MPPT Voltage Range 150V-425V No. of MPP Trackers No. of Strings per MPP Tracker Chart 3-5 Note: This inverter complies with IEC 62109-2 clause 13.9 for earth fault alarm monitoring. If an Earth Fault Alarm occurs,the inverter will not connect to the grid and will report an error F04 on its LCD.At the same �me, the buzzer will sound.
3.6.1 Meter Connec�on Load Grid Inverter Breaker BMS CAN Port RS 485 Port Meter Port System connec�on diagram for the CHNT meter Grid Grid input Output RS 485 DDSU666 DIN-RAIL METER RS485A 230V 5(60) A 800imp/kWh RS485B CHNT DDSU666 CHINT meter Load Grid Inverter...
Note: Iinverter has built–in leakage current detec�on circuit,If an external RCD is required, a type-A RCD with rated residual current of 300mA or higher is suggested.Otherwise inverter may not work properly 3.7 Earth Connec�on(mandatory) Ground cable shall be connected to ground plate on grid side this prevents electric shock. if the original protec�ve conductor fails.
3.9 Wiring System for Inverter This diagram is an example for grid systems without special requirements on electrical wiring connec�on. Note: The back-up PE line and earthing bar must be grounded properly and effec�vely. DC Breaker Otherwise the back-up func�on may be abnormal when the grid fails. In final installa�on, breaker cer�fied according to AS60947.3 shall be installed with the equipment.
4. OPERATION 4.1 Power ON/OFF Once the unit has been properly installed and the ba�eries are connected well, simply press On/Off bu�on(located on the le� side of the case) to turn on the unit.When system without ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and select NO ba�ery, system can s�ll work.(NOTE: Choose the correct country code.
5. LCD Display Icons 5.1 Main Screen The LCD is touchscreen, below screen shows the overall informa�on of the inverter. 12/18/2020 09:21:00 1.85 0.04 -1.79 0.02 1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it turns into "comm./FXX"...
Page 23
5.1.1 LCD opera�on flow chart Solar Page Solar Graph Grid Page Grid Graph Inverter Page Main Screen Battery Page BMS Page Load Page Load Graph Battery Setting System Work Mode Grid Setting System Setup Gen Port Use Basic Setting Advanced Function Device info - 21 -...
5.2 Solar Power Curve Solar This is Solar Panel detail page. ③ ① ① Solar Panel Genera�on. Power: 1560W Today=8.0 KWH Voltage, Current, Power for each MPPT. ② ② PV1-V: 286V PV2-V: 45V Total =12.00 KWH ③ Solar Panel energy for Day and Total. PV1-|: 5.5A PV2-|: 0.0A P1: 1559W...
Li-BMS Mean Voltage:50.34V Charging Voltage :53.2V Batt Total Current:55.00A Discharging Voltage :47.0V Data Mean Temp :23.5C Charging current :50A Total SOC :38% Discharging current :25A Stand-by Dump Energy:57Ah Details SOC: 36% Data U:50.50V I:-58.02A Li-BMS Power: -2930W Charge Volt Curr Temp Energy Fault...
5.4 System Setup Menu System Setup This is System Setup page. System Work Mode Battery Setting Gen Port Grid Setting Basic Advanced Device Info. Setting Function 5.5 Basic Setup Menu Basic Setting Factory Reset: Reset all parameters of the inverter. Lock out all changes: Enable this menu for se�ng Time Syncs Beep...
5.6 Ba�ery Setup Menu Battery Setting Ba�ery capacity: it tells Deye hybrid inverter to know your ba�ery bank size. Batt Mode Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V). Lithium 400Ah Batt Capacity Batt Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
Page 28
Generator This page tells generator output voltage, frequency, power. And, how much energy is used from generator. Power: 1392W Today=0.0 KWH Total =2.20 KWH L1: 228V Freq:50.0Hz Battery Setting Lithium Mode: This is BMS protocol.Please reference the document(Approved Ba�ery). Lithium Mode Shutdown 10%: It indicates the inverter will shutdown Batt if the SOC below this value.
5.7 System Work Mode Setup Menu System Work Mode Work Mode Selling First: This Mode allows hybrid inverter to sell 5000 back any excess power produced by the solar panels to Selling First Max Solar Power the grid. If �me of use is ac�ve, the ba�ery energy also Work Zero Export To Load Solar Sell...
Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load consump�on and charge ba�ery and feed into grid.
Page 31
5.8.2 Grid Standard Selec�on Grid Setting/Grid code selection Grid Mode:General Standard、UL1741 & IEEE1547、 Grid Mode CPUC RULE21、SRD-UL-1741、CEI 0-21、AS4777_A、 General Standard 0/11 AS4777_B、AS4777_C、EN50549_CZ-PPDS(>16A)、 Phase Type Grid Frequency 50HZ Grid NewZealand、VDE4105、OVE-Direc�ve R25. Set1 0/120/240 60HZ Please follow the local grid code and then choose the 0/240/120 corresponding grid standard.
Page 32
Default volt-var se�ngs for different regions are shown in the following table: Voltage 220V 240V 207V 258V Australia A Inverter maximum ac�ve 44%supplying 60%absorbing power output level(P) % of S rated Voltage 220V 235V 205V 255V Australia B Inverter maximum ac�ve 30%supplying 40%supplying power output level(P) % of S...
Page 33
If the Time Syncs Beep Auto Dim engineer does not know the password, please Year Month Basic contact your distributor or Deye. 2019 Hour Minute 24-Hour Factory Reset Lock out all changes 5.8.2 Grid Parameter Check A�er steps above, customers can see firmware version on main page grid parameters in grid...
5.9 Generator Port Use Setup Menu GEN PORT USE Generator input rated power: allowed Max. power from diesel generator. Mode AC couple on grid side GEN connect to grid input: connect the diesel generator to the Generator Input grid input port. AC couple on load side PORT Rated Power...
Advanced Function Ex_Meter For CT: when in Three phase system with CHNT Three phase energy meter (DTSU666), click corresponding Modbus SN Parallel A Phase phase where hybrid inverter is connected. e.g. when the Master B Phase Paral. hybrid inverter output connects to A phase, please click A Set3 Slave C Phase...
Page 36
Mode III: With Smart-Load AC cable DC cable On-Grid Home Load Grid Solar Backup Load Battery Smart Load Mode IV: AC Couple On-Gen+AC couple AC cable DC cable On-Grid Home Load Grid Solar Backup Load Battery On-Grid Inverter On-Load+AC couple AC cable DC cable On-Grid Inverter...
On-Grid+AC couple AC cable DC cable Backup Load Solar On-Grid Inverter On-Grid Home Load Battery Grid Smart Load The 1st priority power of the system is always the PV power, then 2nd and 3rd priority power will be the ba�ery bank or grid according to the se�ngs. The last power backup will be the Generator if it is available.
Page 38
Error code Description Solutions 1. When inverter is in Split phase(120/240Vac) or three-phase GFDI _Relay_Failure system (120/208Vac) system, the backup load port N line needs to connect ground; 2. If the fault still exists, please contact us for help. 1. When the grid type and frequency changed it will report F13; 2.
Page 39
Error code Description Solutions 1. Check the backup load connected, make sure it is in allowed power range; ACOvercurrent fault 2. If the fault still exists, please contact us for help. No Utility 1. Please confirm grid is lost or not; No AC grid 2.
Under the guidance of our company, customers return our products so that our company can provide service of maintenance or replacement of products of the same value. Customers need to pay the necessary freight and other related costs. Any replacement or repair of the product will cover the remaining warranty period of the product.
SUN-3K- SUN-3K- SUN-3.6K- SUN-5K- SUN-6K- Model SG04LP1-24-AU SG04LP1-AU SG04LP1-AU SG04LP1-AU SG04LP1-AU Certifications and Standards CEI 0-21,VDE-AR-N 4105,NRS 097,IEC 62116,IEC 61727,G99,G98, Grid Regula�on VDE 0126-1-1,RD 1699,C10-11 IEC/EN 62109-1,IEC/EN 62109-2,IEC/EN 61000-6-1, EMC/Safety Regula�on IEC/EN 61000-6-2,IEC/EN 61000-6-3,IEC/EN 61000-6-4 General Data Opera�ng Temperature Rande(℃) -40~60℃, >45℃...
Page 43
12. Appendix I Defini�on of RJ45 Port Pin for BMS RS485 Pin CAN Pin 1 2 3 4 5 6 7 8 RS485B RS485A CANH CANL RS485A RS485B RS485 Port CAN Port - 41 -...
Page 44
Meter_CON port This port is used to connect the energy meter. 1 2 3 4 5 6 7 8 RS485 Pin RS485B RS485A RS485B RS485A RS485A RS485B Defini�on of RJ45 Port Pin for DRM Port Modbus port 1 2 3 4 5 6 7 8 DRM port DRM1/5 DRM2/6...