Mount the Fiber CAP L2
Remove the four Phillips head screws from the left junction box cover of the kit and then remove the
junction box cover.
1
Insert a 16 AWG (1.31 mm
2
A plenum rated AC input cable is required when using the Plenum AC Power Supply kit or else the cable
must be routed to the junction box in conduit.
Terminate the cables using WAGO 221 Series Lever-Nuts or equivalent connectors as shown in
3
WAGO 221 SERIES LEVER-NUTS OR EQUIV.
(5 mm)
Torque the cable gland nut to 3.0 Nm (26.5 in-lb) to secure the cable.
4
CommScope ERA
®
CAP L2 with Fiber Interface
Page 26
Figure 9. AC/DC Supply Junction Box Cover Screws
) 3-conductor AC input cable through the cable gland in the junction box.
2
SEE CONNECTION DIAGRAM AT RIGHT.
Figure 10. AC/DC Supply Cable Terminations
GREEN/YELLOW
ACL BROWN
ACN BLUE
Cable Gland
AC INPUT CABLE
© September 2022 CommScope, Inc.
Figure
10.
POWER
SUPPLY
M0203A9B_uc