Three-Pole Bullet Breakers:
GMT Bullet Fuse Modules
Note: GMT Module has Current Capacity of 58A. Maximum fuse size is 12A
Page 20
© 2021 ABB. All rights reserved.
Verify wiring polarity at the input of the load equipment.
Insert two-pole breaker into the distribution as shown in the center of the picture above.
Verify that the alarm pin is straight before insertion. Ensure Circuit Breakers are in the OFF
position prior to installation.
Leave breaker switch in the OFF position until the load equipment is ready to be energized.
Secure three-pole adapter busses to the distribution Load and Return busses with provided
(901352617) 1/4-20 nuts. Use 7/16" socket. Torque to 65 in-lbs. Notice that the return bus
adapter is turned backwards in the distribution picture above. This requires that the load
return lug be connected to the adapter first, then attached to the return bus.
Secure Load and Return Cable connections to the adapter bus with provided hardware
(per cable):
(2) 841064777
3/8-16 nut
(2) 801829607
3/8-inch lockwasher
(2) 802841635
3/8-inch
9/16" socket. Torque to 240 in·lbs.
Terminal lugs should be 3/8 inch holes on 1 inch centers.
Verify wiring polarity at the input of the load equipment.
Insert three-pole breaker into the distribution as shown in the distribution picture above.
Verify that the alarm pin is straight before insertion. Ensure Circuit Breakers are in the OFF
position prior to installation.
Leave breaker switch in the OFF position until the load equipment is ready to be energized.
The return bus on the GMT module has three mounting positions. Remove two 10-32 nuts and
move this bus to the center set of holes. Reinstall the two 10-32 nuts. This allows the
return bus connection to mate with the distribution return bus on the distribution panel.
Insert GMT fuse module into the distribution as shown in distribution picture above. Verify that
the alarm pin is straight before insertion. Using two 901352617 1/4-20 nuts provided,
secure the return bus using a 7/16" socket. Torque to 65 in-lbs.
Strip load wire 3/8" and secure in the GMT module terminal block. Use #1
slot screwdriver. Torque to 13 in·lbs.
Dress and wire tie with service loop to provide strain relief.
Verify wiring polarity at the input of the load equipment.
Do not install load fuses until the load equipment is ready to be energized.
CP:S6000_External Distribution_IG
flatwasher Use
Rev. 1.3