Main specifications Overall assembled size : W3 x L6.5x H3.6(m) / W10 x L21x H12 (ft) Shoulder height : H1.6 (m) / 5ft Door : W1.2 x H2 (m) / 4 x 6.5 (ft) Prior to assembly Please read the instructions carefully before installation.
Page 3
TMG-GHL1020 Part List Parts Graphical Description length(mm) code Top inclined tube 2142 Shoulder tube 1757 Sidewall tube 1452 Sidewall tube 1452 Door frame upper tube 2072 (front and rear truss) Middle upper tube 1552 (rear truss) Top wall mounted tube...
Page 4
Door frame horizontal tube (front truss) Door frame horizontal tube 1375 (rear truss) φ48 Tube clamp Connector tube Roll film tube 1993 Roll film tube -A Film rolling machine guide 1430 tube Clamping groove with hole 2000 Clip spring 2000 Clamping groove 2000 Eight clip spring...
Page 5
Hex bolt and nuts M10x30 Self tapping screw #12x25 Self tapping screw M12x35 Half round head bolt M6x50 Square plug 30x50 Square plug 30x30 φ25 Round plug Braided rope Top cover film W6xL7m Front and rear door film W3.5xL4m Adhesive tape φ8 Socket wrench φ4...
Page 6
Installation steps Step 1 : Review the whole structure and choose the proper installation site Choose a solid, flat floor area where the floor is perpendicular to the walls to build the building. Do not install the building on soft ground, wetland, uneven surfaces, sloped surfaces.
Page 7
Figure 1 Step 3 : Assemble trusses The building includes 6 trusses : (1) The former truss, and (1) Rear truss, and (4) middle trusses. Please note the difference between the front, middle and rear trusses. First assemble the three main pipes of the truss (refer to figure 2) Note the distinction between sidewall tube (#3) and sidewall tube (#3A) W W W .
Page 8
Parts used to install the front and rear truss in this step : (1) Top inclined tube (#1) (1) Shoulder tube (#2) (1) Sidewall tube (#3A) (4) Hex bolt and nuts (#25) Figure 2 W W W . T M G I N D U S T R I A L . C O M P 7 / 1 9 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 9
Install the remaining truss (refer to figure 3) Parts used in this step : (1x5) Top inclined tube (#1) (1x5) Shoulder tube (#2) (1x5) Sidewall tube (#3) (4x5) Hex bolt and nuts (#25) Figure 3 W W W . T M G I N D U S T R I A L . C O M P 8 / 1 9 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 10
After installing the screws of the trusses, handle the pipe head interface : seal the interface with adhesive tape (#37) and truss installation method (refer to figure 4) Parts used in this step : (1) Adhesive tape (#37) Figure 4 W W W .
Page 11
Assemble all trusses and fix the trusses on the baseboard. The installation effect drawing of all trusses (refer to figure 5). Parts used in this step : (4x6) Hex bolt and nuts (#25) Figure5 W W W . T M G I N D U S T R I A L . C O M P 1 0 / 1 9 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 12
Step 4 : Install the roof purlin. Install roof purlin to fix all trusses (refer to figure 6) Parts used in this step : (2x5) Roof purlin (#5) (2x6) Hex bolt and nuts (#24) Figure 6 W W W . T M G I N D U S T R I A L . C O M P 1 1 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
Page 13
Step 5 : Installation of rear trusses riser ( refer to figure 7). Parts used in this step : (2) Sidewall tube (#3) (1) Door frame upper tube (#3B) (1) Middle upper tube (#3C) (2) Door frame horizontal tube (#11) (4) Tube clamp (#12) (8) Hex bolt and nuts (#25) (4) Hex bolt and nuts (#26)
Page 14
Step 6 : Install the front truss riser and door (refer to figure 8). Parts used in this step : (1) Sidewall tube (#3) (1) Door frame upper tube (#3B) (1) Door left lower vertical tube (#6) (1) Door left upper vertical tube (#6A) (1) Door right lower vertical tube (#6B) (1) Door right upper vertical tube (#6C) (1) Door frame cross pull tube (#7)
Page 15
Figure 8 The whole structure inspection : Check all components and trusses to ensure that top square pipe assembly welding of the wall is in line with the baseboard on the ground. All trusses must be erected at an angle of 90 degrees. All purlins must be straight in line. If any purl ins are not in line with they will need to be corrected before moving to the next step.
Page 16
Step 7 : Install board, clamping groove and then cover tarpaulin (refer to figure 9). Parts used in this step : (4) Clamping groove with hole (#16) (32) Clamping groove (#18) (165) Self tapping screw (#28) (24) Self tapping screw (#29) (20) Philips head screw (#40) (20) Expansion rubber plug (#41) (9) Board (not included) (#42)
Page 17
Note : 1. The top clamping groove (#18) is fixed on the top square pipe assembly welding (#4,#4A) with Self tapping screw (#28). 2. The board (#42) is directly nailed to truss sidewall tube (#3,#3A) with self tapping screw (#29).
Page 18
Installation and distribution of rear clamping film groove (refer to figure 11). The excess parts can be trimmed off. Parts used in this step : (9) Clip spring (#17) (1) Front and rear door film (#36) Figure 11 W W W .
Page 19
After installing tarpaulin on both sides, install top cover film (#35) (refer to figure 12). First clamp tarpaulin with clip spring from the top, and then to the side. Parts used in this step : (14) Clip spring (#17) (1) Top cover film (#35) Figure 12 Step 8 : Installing the Film rolling machine.
Page 20
Parts used in this step : (3) Roll film tube (#14) (1) Roll film tube-A (#14A) (1) Film rolling machine guide tube (#15) (10) Eight clip spring (#19) (5) Pressure film carrier (#20) (1) Film rolling machine (#21) (1) Hex bolt and nuts (#26) (12) Self tapping screw (#28) (1) Round plug (#33) (20) Braided rope (#34)