Download Print this page

Advertisement

Quick Links

Pent Play House Assembly Manual
Ready To Build - 4ft Range
Thank you for purchasing your Total Shed.
All of our sheds are made from only the finest selected timber which are
(Tanalised), specially pressure treated for a longer and lasting durable life
span to the elements.
Each shed is carefully packed and delivered on a pallet
ready to be assembled.
FEATURES NEW FLEXIBLE,
INTER-CHANGEABLE DESIGN
FOR YOUR INDIVIDUAL STYLE.
2 Persons Recommended for Assembling Shed
Tools Required:
DRILL DRIVER
HAMMER
PLEASE NOTE: Use extreme caution when using any tools. Always wear safety gear where
necessary. It is advisable that at least 2 or more persons assemble the shed for health and safety
purposes. We are not responsible for any injuries caused whilst assembling this shed.
Ready to Build Play House
Featured Build of the Pent 8x4ft Play House
Includes 4x4ft to 12x4ft Instructions
Pressure Treated Tanalised Timber for Longer Lasting Life!
HAND SAW
STANLEY KNIFE
Total Sheds
Unit 1 Park Lane,
West Bromwich, B21 8LE
Tel: 01902 636 529
Email: info@totalsheds.co.uk
Version 1.4
DELIVERED FLAT PACKED IN
EASY TO INSTALL SECTIONS
www.totalsheds.co.uk

Advertisement

loading
Need help?

Need help?

Do you have a question about the Pent Play House 8x4ft and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for total sheds Pent Play House 8x4ft

  • Page 1 Pent Play House Assembly Manual Pressure Treated Tanalised Timber for Longer Lasting Life! Ready To Build - 4ft Range Total Sheds Unit 1 Park Lane, West Bromwich, B21 8LE Tel: 01902 636 529 Email: info@totalsheds.co.uk Version 1.4 Thank you for purchasing your Total Shed.
  • Page 2: Pre-Assembly

    PRE-ASSEMBLY STEP • 1 Unpacking your Parts Recommended: Paint shed in an oil based treatment to Unpack all of the components and check that prevent water ingress into you have all the parts required. Please use the checklist on previous page. the timber.
  • Page 3 STEP • 2 STEP • 3 IMPORTANT FIRST 4ft SIDE PANEL All Play Houses with 2 Place first panel againts or More Floor Pannels far left of the Play House have the smallest Floor floor as shown. Panel on the Right End. (4ft wide blank panel) As shown on this diagram.
  • Page 4: Rear Panels

    STEP • 4 STEP • 5 RIGHT SIDE PANEL REAR PANELS Now attach Right Side Fix 4ft Wide Blank Panel (4ft wide section) Sections. Create a Corner for Balance. REAR PANELS RIGHT SIDE PANEL 4a. Place a 4ft Blank Panel side as shown below. 5a.
  • Page 5 STEP • 6 STEP • 7 FRONT WINDOW FRONT DOOR PANEL PANEL Attach Front Attach Door Panel (4ft Door Panel) Window Panel (4ft Window Panel) FRONT DOOR PANEL WINDOW PANEL 6a. Use the areas below as reference 6b. Place the Door Panel as shown and fix in place 7a.
  • Page 6 STEP • 8 STEP • 9 PENT FRONT TOPS SIDE PENT ANGLE TOPS Place the front tops on Now attach all the Side to the Play House Pent Angle Tops. SIDE PENT ANGLE TOPS FRONT PENT TOPS 9a. Place the Pent Front Top sections in place. Use the corrisponding sized tops with the correct 8a.
  • Page 7 STEP • 10 STEP • 11 SIDE & CORNER STRIPS PENT ROOF PANELS Hide the panel edges. Place First roof section. Cover the framework & Repeat for all Roof Panels seams. (2ft & 4ft) SIDE & CORNER STRIPS PENT ROOF PANELS 10a.
  • Page 8 STEP • 12 STEP • 13 ATTACH THE ROOF FELT CUTTING THE ROOF Use the felt lengths FELT provided. Use the felt table to cut your felt to the correct size CUTTING THE ROOF FELT ROOF FELT 13a. Apply the roof felt as shown. (The Felt will come as a Full roll, this will need to be cut).
  • Page 9 Create the Final Roof Create the Final Roof Edges. Edges. Final steps finishing off the Play House Final steps finishing off the roof. Total Sheds Unit 1 Park Lane, West Bromwich, B21 8LE Tel: 01902 636 529 FELT STRIPS FINISHED Email: info@totalsheds.co.uk...