Applying Power

Double check to ensure all wiring is correct
Measure line voltage to be applied to the input side of the
VLT unit (terminals L1, L2 and L3) to verify it is within +/-
10% of the rated input voltage
Ensure fuses are correct and in place
Ensure all run and speed commands are off or at zero
Power is ready to be switched on