Installation - Tecnoinox P81FDG9 Instruction Manual For Installation And Use

Freestanding 100lt gas boiling pan - ind irect heating
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 14
When installing the appliance it is necessary to follow and comply with the following regulations:
current regulations on the matter;
any hygienic-sanitary regulations concerning cooking environments;
municipal and/or territorial building regulations and fire prevention prescriptions;
current accident prevention guidelines;
standards for the use of combustible gas;
standards for gas-fired systems utilizing on-tap or liquid petroleum gas;
standards relating to gas-fired cooking appliances and similar equipment used large-scale catering. Safety requirements;
standards relating to gas systems for appliances used in professional kitchens and communal facilities;
the regulations of the gas supply company or agency;
electricity board regulations concerning safety;
the regulations of the electrical power supply company or agency;
any other local prescriptions.
The appliance belongs to the installation class A
the environment in which it is installed to be well-aired and provided with all the safety openings prescribed for its power.
In addition, it is good policy to locate the appliance under an extractor hood so that cooking vapours can be removed rapidly and continuously.
The gas supply system must be equipped with a rapid on off tap approved for the purpose.
This appliance requires two water connections: one for hot and one for cold water. Each line must be fitted with an on-off valve.
The shutoff valves must both be located near to the appliance, within easy reach for the user.
-
Remove all the packaging and check that the appliance is in perfect conditions. In case of visible damage, do not connect the appliance and notify
the sales point immediately.
Remove the PVC protection from the panels.
Dispose of packaging according to regulations. Generally material is divided according to composition and should be delivered to the waste disposal
service.
Maintain a distance of 5 cm between the back (chimney) of the appliance and the wall. There are no particular prescriptions regarding side distances
from other appliances or walls, however it is advisable to leave enough space in case of maintenance and/or repairs. It is advisable to fit a suitable
heat insulation if the appliance is in direct contact with inflammable walls.
The appliance must stand level. Small differences in level can be eliminated by screwing or unscrewing the adjustable feet: A significantly
uneven or sloping stance can affect the operation of the appliance adversely.
Only qualified technicians must perform the installation, maintenance and test of the appliance.
-
Before connecting any parts of the appliance to supplies, make sure that the latter is equivalent the requirements stated in
-
the technical data plate, if the appliance has been designed for these supplies.
Water inlet pressure must be between 50 and 300 kPa, otherwise install a pressure regulator on the line before the appliance.
Install a cut-off valve for each supply on the line before the appliance.
Water connections to 10 mm are fitted in the lower part on the left-hand side of the appliance.
Make connections according to regulations currently in force.
The choice of the gas piping depends on the diameter required for the type of gas, appliance and installation and should be performed in conformity
with current regulations.
The gas feed plant can either be fixed or be disconnected; if flexible pipes are employed they must be made from stainless material and not be
affected by corrosion.
If sealing materials are used for connections, they must be certified and approved for the purpose.
The gas fitting is located on the lower right side of the appliance
Once the appliance has been connected, carry out a leakage test on all the fittings connecting the appliance to the plant. It is advisable to use a
leakage spray, otherwise treat the parts with a foam that does not produce corrosion; no bubbles should develop. Carry out the leakage test
also on the rapid cut-off valve.
Flames are strictly prohibited for leakage tests!
-
LAWS, TECHNICAL PRESCRIPTIONS AND DIRECTIVES
SPECIAL REQUIREMENTS FOR THE INSTALLATION SITE
(no direct connection of a chimney of flue exhaust system is required), so it is very important for
1
CONNECTION TO WATERWORKS
GAS CONNECTION PROCEDURES
POSTIONING

INSTALLATION

15
5410.299.00

Advertisement

Table of Contents
loading

This manual is also suitable for:

P85fdg9P81figP85fig9313074

Table of Contents