ABB PDCOM Installation Manual page 13

Table of Contents

Advertisement

DISTRIBUTION SOLUTIONS
Figure 14: Shields hearth to VIS interface
• Step 3: Install the PCDOM in the LV cabinet, closest
to VIS interface and connect the cable between the
VIS interface and the PDCOM (5.2).
- Connect the ethernet cable 5.3 to the SWICOM or
to the previous PDCOM if more than one is
installed.
- The VIS interface must be the one dedicated with
capacitor mounted
Figure 15: PDCOM connections
13

Advertisement

Table of Contents
loading

Table of Contents