Lifting the machine

ALWAYS lift the machine on the level ground.
NEVER lift the machine loaded with any personnel.
Make sure the lifting cables and other lifting devices are strong enough to support the
machine.
Use guide or tag lines to prevent the machine from swinging or turning.
Weight on lifting the machine: 10300 kg
Sling jig
1.
Prepare strong enough wire ropes, shackles, sling frame and sling jigs.
2.
Fix the sling jigs at the positions of the crawler frame shown above and pass the wire
rope through them.
3.
Install the wire rope to the sling frame with the shackle.
4.
Install the wire rope to the crane hooks and lift upward so the crawler is a little bit above
the ground, then stop lifting.
5.
If the balance is good continue slowing lifting the machine.
IC75 ENG
OPERATION
WARNING
Shackle
Shackle
Sling frame
Sling jig
3-19
Pipe