TYAN GC68A-B8056 Service Engineer's Manual page 93

Table of Contents

Advertisement

3.
Remove the external cap from the rail frame.
4.
Align and install the carrier frame with package into the slot on the rail frame.
NOTE:
During installation, observe the following:
make sure to push the carrier frame with package towards the end of the rail
frame until it clicks in place.
do not drop the carrier frame or touch the package pad to avoid component
damage.
5.
Using your thumbs and forefinger, remove the PnP cap by lifting it up
vertically.
93
http://www.tyan.com

Advertisement

Table of Contents
loading

Table of Contents