TYAN GC68A-B8056 Service Engineer's Manual page 33

Table of Contents

Advertisement

Using your thumbs and forefinger, remove the PnP cap by lifting it up
4.
vertically.
Align and install the carrier frame with package into the slot on the rail frame.
5.
Note: During installation, observe the following:
6. Carefully close the rail frame with the installed package. Then push both
edges of the rail frame firmly until it locks in place.
NOTE:
During installation, observe the following:
1. Make sure to push the carrier frame with package
towards the end of the rail frame until it clicks into place.
2. Do not drop the carrier frame or touch the package
pad to avoid component damage.
http://www.tyan.com
33

Advertisement

Table of Contents
loading

Table of Contents