Installation Requirements; Installation Checklist - Electrolux EWMED70JSS Installation Instructions Manual

Front-load gas & electric dryer
Table of Contents

Advertisement

Available languages

Available languages

Please read and save this guide
Thank you for choosing Electrolux, the new
premium brand in home appliances. These
Installation Instructions are part of our commitment
to customer satisfaction and product quality
throughout the life of your new appliance.
Exhaust Venting
Free-fl owing, clear of lint buildup
4 inch (102 mm) rigid or semi-rigid ducting
of minimal length and turns
NO foil or plastic venting material
Approved vent hood exhausted to outdoors
Leveling
Dryer is level, side-to-side and front-to-back
Cabinet is setting solid on all corners
Gas Supply (Gas Dryer)
Manual shutoff valve present in supply
All connections sealed with approved sealer
and wrench tight
Conversion kit for LP system
Gas supply turned on
No leaks present at all connections -
check with soapy water, NEVER check with
fl ame
Pre-installation requirements
Tools and materials needed for installation:
Adjustable
Phillips, straight, &
pliers
square bit screwdrivers
4 i
4 inch, rigid metal or
h i id
t l
semi-rigid metal exhaust duct work

Installation Requirements

Questions?
For toll-free telephone support in the U.S. and
Canada: 1-877-4ELECTROLUX (1-877-435-3287).
For online support and product information visit
http://www.electroluxappliances.com.

Installation Checklist

240v Electric Supply (Electric Dryer)
Door Reversal
Electrical Power
Final Checks
Adjustable
Universal wrench
wrench
supplied with
matching washer
3-wire or 4-wire
240 volt cord kit
(10.2 cm)
(electric dryer)
clamp
Approved NEMA 10-30R or 14-30R service
cord with all screws tight on terminal block
Approved strain relief installed
Terminal access cover installed before initial
operation
Follow detailed instructions in this guide
Test hinge and latch for function
House power turned on
Dryer plugged in
Installation Instructions and Use and Care
Guide read thoroughly
Door latches and drum tumbles when cycle
starts
Registration card sent in
or
Pipe wrench
LP-resistant
for gas
thread tape
supply
(for natural gas
or LP supply)
½" NPT union flare
4 in.
gas line
adapters (x2) and
shutoff valve
flexible gas supply line
(gas dryer)
(gas dryer)
or
Carpenter's level
External
vent hood
Metal foil tape
(not duct tape)
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents