Section 5 Operation; Pre-Operation Check; Operation Equipment; Table 5-1 Equipment Recommended For Operation - Will Burt Hurry-Up Mast 3.5-7 Operator's Manual

Telescoping mast
Table of Contents

Advertisement

Section 5
This section describes the operation of the mast system. Be sure to read and understand the
entire operation procedure and Safety Summary (Section 1) before beginning operation.

5.1 Pre-Operation Check

Before operating the mast system, ensure:
All operators read and understand the entire operation procedure and are properly
trained.
The mast system is undamaged. If damage is apparent, do not use the mast system,
and have it serviced prior to use.
The area is free of power lines or other overhead obstructions. The mast system location
should be no closer than a horizontal distance equal to the extended height of the mast
away from power lines.
Any objects that might obstruct motion of the mast system, cause binding, or hinder
mast system function are removed.
The mast system and payload are properly installed. The mast should be plumb.
When using a vehicle, the vehicle is not moving and is on level terrain.
Any transit tie-downs have been removed.
The mast system area is free of personnel.
The operator has full view of the mast system during use.
Check with The Will-Burt Company's Engineering for additional wind information for customer-
specific loading scenarios.

5.2 Operation Equipment

Table 5-1 lists recommended equipment for operation.
Personal Protective*
Safety Glasses
Hearing Protection
*Depending on the national and local standards and codes of practice, and the environment, additional personal
protective equipment may be necessary.
TP-5928001-C
February 2023
Operation

Table 5-1 Equipment Recommended for Operation

Recommended Equipment
Work Gloves
Hard Hat or Helmet
H
-U
® M
O
URRY
P
AST
PERATOR
Nitrile or Vinyl Gloves
Safety Shoes
'
M
S
ANUAL
5-1

Advertisement

Table of Contents
loading

Table of Contents