I. Mounting Preparation

1. After opening the case, read this introduction carefully, check all the packed parts, and examine the shower cabin
for shipping damage. If the unit has been damaged or has a finishing defect, please contact your local distributor
within 3 business days. Please note that DreamLine Guarantee will not cover shipping damage or such finishing
defects once the unit has been installed. Your distributor's responsibility for damage in transit is limited after the
shower package has been transferred to the transportation company, so you may have to contact the transportation
company directly to report damage. Contact your distributor or DreamLine if you have any questions.
2. You should make sure that the floor is leveled and solid and will be able to support the total weight of the unit and
its occupant. You should also consult your local building codes on questions on installation compliance standards.
3. Install all of the required plumbing and drainage before securing the shower. Use a competent and licensed (if
required by local code) plumber for all plumbing installation.
4. Please insure that prior to the installation the floor is leveled and the walls are at right angles. While some
adjustment in leveling of the tray is possible, irregular floor level or improper angle of side walls will result in
serious problems for your installation. Please, note that there are some adjustments and drilling might be necessary
during the installation process.
5. Necessary Tools: Conventional woodworking tools, Screwdriver, Silicone sealant, Electric drill, Regular drill bits
(1/8", 7/64"), Phillips screwdriver, Level, Measuring tape, Pencil and Stepladder. Bear in mind that you will need at
least two people to assemble the unit.

II. Packing List

Top cover (1 pc)
Jetted panel (1 pc)
Phillips pan head screw (10 pcs)
Full thread tap bolt set (8 pcs)
Phillips flat head screw (12 pcs)
Shower tray (1 pc)
Glass enclosure assembly (1 pc)
Handles (2 pairs)
© 2002-2006 DreamLine™. All Rights Reserved
Riviera / DLG-51
Entry door (2 pcs)
Stationary side glass panel (2 pcs)
Wall connecting profile (2 pcs)
Phillips pan head screw (8 pcs)
Thread forming screw (8 pcs)
Rubber stopper (8 pcs)
Guide rail (2 pcs)
Riviera/DLG-51
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Riviera DLG-51 and is the answer not in the manual?

Questions and answers

Summary of Contents for Dreamline Riviera DLG-51

  • Page 1 If the unit has been damaged or has a finishing defect, please contact your local distributor within 3 business days. Please note that DreamLine Guarantee will not cover shipping damage or such finishing defects once the unit has been installed. Your distributor’s responsibility for damage in transit is limited after the shower package has been transferred to the transportation company, so you may have to contact the transportation company directly to report damage.
  • Page 2 Parts Tray pre-installation instructions * This is not a picture of the unit tray © 2002-2006 DreamLine™. All Rights Reserved Riviera/DLG-51...
  • Page 3 Step 21. 16. Adjust the door rollers making sure the doors slide smoothly and close tight. 17. Attach the handles. 18. Connect hot and cold water pipes to the water supply. © 2002-2006 DreamLine™. All Rights Reserved Riviera/DLG-51...
  • Page 4 NOTE: Allow 24 hours for the silicone to set before testing or using the shower. NOTE: Improper application of silicone sealant may cause your shower to leak. Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 9 Step 8 Step 10 © 2002-2006 DreamLine™. All Rights Reserved Riviera/DLG-51...
  • Page 5 Step 11 Step 12 Step 13 Step 14 Step 18 Step 15 Step 16 Step 17 Step 19 Step 20 Step 21 Step 22 Step 23 © 2002-2006 DreamLine™. All Rights Reserved Riviera/DLG-51...

Table of Contents