Download Print this page

Kohler HYDRO-TOWER 200 Installation Instructions Manual page 3

Pneumatic in-wall tank with frame short height
Hide thumbs Also See for HYDRO-TOWER 200:

Advertisement

4. Loosen the nut securing the adjustable bracket
and extend to the required height.Tighten the nut.
5. Fit the toilet fixing bolts in the required position
to suite the pan fixing holes (180mm or 230mm)
refer to toilet installation instruction. If no fixing
kit is supplied with the pan, use the fixing kit
supplied with the tank. Use lubricant as required
and ensureenough of the screw is exposed to
mount and secure the toilet.
6. Insert the frame screw and screw cap in the
holes of fixing frame, lock the frame screw with nut
on the base bracket.
7. Place the frame into the cavity.
To install on concrete:
1. Drill 4 holes with the diameter of Ø10
and 80mm depth.
2. Insert the flush head sleeve masonry
anchor and tighten the anchor bolts with
the nut by spanner.
3.Tighten the adjustable bracket by allen key.
Note: Ensure the tank is level.
To install on timber:
1. Place the frame into the cavity (stud pocket),
ensuring the front face of the frame is flush
with the front of stud.
2. Fix the adjustable brackets to the base plate
with coach/tek screws M8 (not supplied).
3. Place the nog (not supplied) on frame, ensuring
the bottom face of the nog is below the fixing hole
to provide enough area for a secure fixing.
4. Ensure the nog is level.
5. Mark the position of nog on both vertical studs.
6. Remove the nog.
7. Fix the nog to the studs.
8. Attach the frame to the nog. Use minimum M8
coach/tek screws (not supplied).
9. Tighten the screws.
10. Tighten the adjustable bracket by allen key.
Note: Ensure the tank is level.
A2) DISCHARGE OUTLET INSTALLATION METHODS
P-trap installation
1. Loosen screw on waste pipe support bracket if required.
2. Insert the waste pipe connector.
3. Adjust waste connector position and tighten the waste pipe support bracket to secure the waste pipe connector.
Note: Ensure the flush pipe and waste pipe are the correct height from the finished floor level, refer to the toilet manufacturers
instructions and adjust if neccessary.
1310920-A02-A
Anchor bolt
Nog
-3-
Pan fixing
(5)
bolts
Allen bolt
Allen key
(6)
Adjustable bracket
(4)
Gasket
Anchor bolt
Coach Screw
Fixing Hole
Nog
Base bracket
Nut
Frame screw
Screw cap
Tank frame
Base plate
Stud
M8 coach/tek
screw

Advertisement

loading

This manual is also suitable for:

20007a-pne-na20341t-pne-cp