Mounting - ABB Caldion FCR-F-2-4.2.21.1 Series Product Manual

Room temperature controller
Table of Contents

Advertisement

5.4

Mounting

Once you have connected all cables for the electrical connection and the connection to the
busline, mount the device in the flush-mounted box.
To install the device, perform the following steps:
Fig. 7:
Installation position of flush-mounted insert
[1] Insert the flush-mounted insert into the flush-mounted box.
Pay attention to the correct installation position.
Orientate yourself on the " TOP" marking.
[2] Screw the flush-mounted insert in place.
Use the provided screws.
3
Fig. 8:
Fitting the front cover
[3] Place the front cover on the lower edge of the flush-mounted insert.
[4] Push the anti-theft device (clip) about halfway into the provided shaft.
Pay attention to the correct orientation of the clip.
When the clip is pushed in about halfway, the front cover can snap into place.
Product manual 2CKA001373B8563
1
4
5
Connection and installation
2
│18

Advertisement

Table of Contents
loading

Table of Contents