Nortel Meridian Meridian 1 Upgrade Manual page 32

81c igs to cs 1000m mg cp pii fnf upgrade
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Page 32 of 284
Preparing and planning for the upgrade
NN43021-469 Standard 01.01 May 2007
Result: If the backup is successful, the system displays a message that
states that the database backup is complete and generates a report that
indicates which floppy drives were used.
4
If there are validation errors, repeat the procedure.
CAUTION
Loss of Data
If the backup is not successful, do not continue; contact
your technical support organization. Any backup
problems must be corrected before the system is
upgraded to CP PIV.
5
Once the backup is complete, type:
****
If the system is equipped with IOP/CMDU cards the
database must be converted with the Database Transfer
utility below.
If the system is equipped with IODUC cards, the
database should be data dumped (EDD) to a blank 2 MB
floppy.
All systems can be converted by Nortel in the software
conversion lab.
Procedure 4
Converting the 4 MB database media to 2 MB database media
Before the system is upgraded to CP PIV, the database must reside on a
2 MByte floppy disk for conversion to CF. Systems with an IODU/C drive
already have 2 MByte floppy drive and can skip this procedure.
Exit program
IMPORTANT!

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1Communication server 1000m

Table of Contents